- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Queuing Problems.ppt
Queuing Problems Simulation vs. Queuing Theory Problem 1 A tool crib has exponential inter-arrival and service times, and it serves a very large group of mechanics. The mean time between arrivals is 4 minutes. It takes 3 minutes on average for a tool-crib attendant to service a mechanic. The attendant is paid $10 per hour and the mechanic is paid $15 per hour. Would it be advisable to have a second tool-crib attendant? Problem 2 A two-runway (one for landing and one for taking off) airport is being designed for propeller driven aircraft. The time to land an airplane is known to be exponentially distributed with a mean of 1? minutes. If airplane arrivals are assumed to occur at random, what arrival rate can be tolerated if the average wait in the sky is not to exceed 3 minutes? Problem 3 The Port of Trop can service only one ship at a time. However, there is mooring space for three more ships. Trop is a favorite port of call, but if no mooring space if available, the ships have to go to the Port of Prot. An average of seven ships arrive each week, according to a Poisson process. The Port of Trop has the capacity to handle an average of eight ships per week, with service times exponentially distributed. What is the expected number of ships waiting or in service at the Port of Trop? How much business is lost to the Port of Prot? Problem 4 A machine shop repairs small electric motors that arrive according to a Poisson process at a rate of 12 per week (5-day, 40-hour workweek). An analysis of past data indicates that engines can be repaired, on average, in 12.5 hours, with a variance of 1 hour2. How many working hours should a customer expect to leave a motor at the repair shop (not knowing the status of the system)? If the variance of the repair time could be controlled, what variance would reduce the expected waiting time to 6.5 hours? * * *
您可能关注的文档
- Manila folder bridges.ppt
- March 1999.ppt
- Market Pricing.ppt
- Mathematics Beauty and the Beast.ppt
- Mathematics Learning for All How Can It Be Done.ppt
- Mattias WennströmUppsala UniversitySweden.ppt
- McGraw-Hill.ppt
- Measuring Instruments.ppt
- Mechanical Ventilation and Intracranial Pressure.ppt
- MENA Women in the EconomyRabat, December 8-9, 2005.ppt
- Radio Content Analysis 101.3 WWQQ.ppt
- Rainwater Collection & Utilization for Irrigation.ppt
- REHABILITATION OF THE STROKE SURVIVOR.ppt
- Renewable Resources Development Report.PPT
- Resilient Modulus Testing and Startup Procedures.ppt
- Revised Article 9.ppt
- RIMTA Shrink Wrap Recycling Program.ppt
- Robin Hood and the 40 Million Thieves.ppt
- Rootstocks.ppt
- Round 4862 to the nearest hundred..ppt
最近下载
- 略阳县金子山尾矿库闭库工程施工组织设计方案.doc
- 蒸汽管道报检资料.pdf VIP
- 尾矿库项目施工组织设计.doc VIP
- Unit4Reading+I课件2024-2025学年牛津译林版英语八年级上册.pptx VIP
- 高考数学直线与圆常用二级结论,高考数学常用二级结论.doc VIP
- 2025高考数学核心二级结论速记指南.pdf VIP
- 生活中的方向 第1课时 教室里的方向(教学设计)数学苏教版二年级上册(新教材).docx
- 2025年中国氧化锆质发热元件市场调查研究报告.docx
- 《国际船舶医疗指南》第3版发行.doc VIP
- 2025贵州省科学技术协会招聘直属事业单位工作人员6人模拟试卷含答案详解.docx VIP
文档评论(0)