关于索拉桥预应力荷载的一种新的设计技术(原文).docVIP

关于索拉桥预应力荷载的一种新的设计技术(原文).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
关于索拉桥预应力荷载的一种新的设计技术(原文).doc

A NEW DESIGN TECHNIQUE FOR PRE-STRESSED LOADS OF A CABLE-STAYED BRIDGE R. Takagi, T. Nakamura and K. Nakagawa Abstract:This paper introduces a new design technique for obtaining pre-stressed loads acting on a cable-stayed bridge. We proposed the design method to design optimum cross-sections of the frame structure in order for them to average stresses under maximum combined loads. This method is extended and applied in the present paper. One of the theoretical characteristics of the technique is to minimize the sum of squares of stresses to improve the member forces throughout the structure. Another is that the group of pre-stressed loads is statistically expressed by the residual sum of squares from initial values. The optimum pre-stressed loads are mathematically treated as an extreme value in the variational problem. Also, the technique contains the eigenvalue problem in the process of solving the extreme value. The paper presents the theoretical technique, as well as the application of the technique using numerical examples. 1. INTRODUCTION We have previously proposed the optimum design techniques for obtaining the optimum cross-sections of the frame structure and for minimizing the sum of the squares of the combined stresses under the applied loads (Ref. [1]). The optimum sections receive averaged stresses of all the applied loads and resist them because of the uniform strength of the structure. This technique gives the equivalent of an effective section in static design. The present paper introduces the available design technique for obtaining the added-cable loads by which the member force throughout the cable-stayed bridge would be improved. These added loads are named as pre-stressed loads in the present paper. One of the theoretical characteristics of the present paper is that the technique to minimize the sum of the squares of stresses is adopted. This will improve the member forces through the structure. Another characteristic is that the group of pre-st

文档评论(0)

docinpfd + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:5212202040000002

1亿VIP精品文档

相关文档