东营奥体中心网球馆工程论弧形看台综合施工技术.docVIP

  • 2
  • 0
  • 约1.06万字
  • 约 26页
  • 2015-08-03 发布于江苏
  • 举报

东营奥体中心网球馆工程论弧形看台综合施工技术.doc

东营奥体中心网球馆工程 论弧形看台综合施工技术 目 录 摘要····································································3 关键词·································································3 工程概况·························································3 工艺流程·························································3 脚手架工程······················································4 钢筋工程·························································7 模板工程·························································13 混凝土工程······················································18 质量控制要点···················································20 工程创新点······················································21 结束语································································21 参考文献·····························································22 摘要:随着国内外全民健身的热潮,各大赛事的召开,各省将陆续简历各自的体育场馆,对体育场馆这样大型的公建来讲,并不是所有人都能参与建设的,因此,如何在施工时把工程质量在上一个新的台阶已经成为一个技术难题。对体育场、体育馆这样的公建工程,施工风险大,如果技术方案不当或施工工法不当就会出现质量问题。现就东营奥体中心项目网球馆工程看台施工技术 关键词:弧形看台 技术方案 施工工法 Abstract: With the domestic and foreign national fitness craze, major events, the provinces will soon resume their sporting venues, for sports venues in such a large public, not all people can participate in the construction, therefore, how to in the construction project quality in a new step is a technical problem. For public projects, construction of stadium and gymnasium such risk is big, if improper technical solution or improper measures will appear quality problem. Key words: Arc stand Technical solution Construction method 一、工程概况 本工程位于山东省东营市东城东三路以东、南二路以南、胜利大街以西、奥体路以北。游泳馆布置在场地的西南侧,北侧为体育馆,东北侧位主体育场,南邻奥体路,西侧为停车场;二层于室外平台相连,有优越的交通条件和良好的视线景观。 二、工艺流程 放实样→放线→搭架→斜梁底模→斜梁侧模→斜梁钢筋绑扎→看台梯踏步模板→斜梁另一侧模→另一半看台梯踏步模板→梯踏步梁及底板钢筋绑扎→梯踏步外立模支撑→梯踏步面筋绑扎→混凝土浇筑→看台养护 脚手架工程 1.脚手架的材料筹办 (1)钢管采用外径48mm,壁厚3.5mm 烧焊钢管。 (2)扣件采用生铁扣件,质量应切合GB15831-2006《钢管脚手架扣件》的规定。 (3)底座采用烧焊底座。 (4)垫板采用5cm、20cm 以上宽木脚手板。 2.脚手架搭设的作业前提 (1

文档评论(0)

1亿VIP精品文档

相关文档