精拉线报验流程总稿.doc
精拉线报验流程
INSPECTION PROCESS FOR SHAFT CENTER LINE ALIGNMENT
编写: 张晓勇
DRAWING: zhangxiaoyong
校对:
CHECK:
审核:
CHECKUP:
日期: 2004-12-18
DATE: 2004-12-18
部门: 造船技术
DEPARTMENT:THECHNOLOGY DEPARTMENT
目 录
CATALOGUE
1.精拉线报验的时机…………………………………(1)1.Inspection time for shaft line allignment…(1)
2.精拉线报验流程及简单步骤………………………(2)2.Inspection process and simple step for shaft and rudder central line alignment……………………(2)
3.精拉线报验时激光操作流程………………………(4)3.Laser aid operating process for inspection(4)
4.精拉线报验测量图表………………………………(5)4.Measure sheet for inspection…………………(5)
一、拉线报验的时机
Inspection time for shaft line allignment
1. 艉楼甲板以下,机舱前壁(#50)体结构主要焊接工作完工,(不包括主机、发电机吊装预留口),火工矫正工作结束,艉部支撑须拆除,停止振动性作业。
Finish the primary welding and flame shrinking of the main hull structure below the POOP deck and backward the front of E/R bulkhead(#50)(excluding the pre-opened hole for vertical loading M/E A/E). Dismount tail support and stop vibrant operation.
2. 上述区域的双层底、艉尖舱、机舱内与船体联接的箱柜密封性试验结束,相应管路安装完成。
Leakproofness tests should be finished for all tanks aft #50 connected to hull incl. compl. Finished installation of attached pipes.
3. 轴系所通过的横向舱壁应当预先开孔,前后艉柱应焊装完毕。
The athwartships bulkhead which shafting passes through must be pre-drilled; fore/aft sternpost must be welded.
4. 机舱内的辅助设备必须进舱。
The accessory equipment must be carried into E/R.
5. 轴系中心线的确定应在晚上或阴天进行。
To operate must be in the night or in cloudy sky.
6. 机舱必须清洁干净,结构的打磨工作完成。
E/R has to be clean; structure-grinding works have to be finished
二、精拉线报验流程及简单步骤
Inspection process and simple step for shaft and rudder central line alignment
1.查轴线地样线左右偏差量,检查舵零点及#7肋位共两点;
Check the left and right deviation between the axis line and the base line,check the rudder zero point and the two point near the #7 frame position;
2.量艉轴口处标杆高度即船台基线到激光水平线高度;
Measure the height of the mark pole at stern tube,i.e.the height from the base line of the berth to the horizontal laser line;
3.光到FR47标杆,调焦、检查标杆十字线吻合度;
Give light to the mark pole at the f
您可能关注的文档
最近下载
- SYT 5069-2017 石油天然气工业 钻井和采油设备 管柱类落物打捞工具.docx VIP
- WF-007A多功能自动氩弧填丝机使用说明书7.pdf VIP
- SYT 5496-2017 石油天然气工业 钻井和采油设备 震击器及加速器.pdf VIP
- 2025年烟花爆竹经营企业(包括批发和零售企业)安全检查表.pdf VIP
- 2025至2030药用真菌行业调研及市场前景预测评估报告.docx VIP
- SYT 5382-2009 钻井液固相含量测定仪.docx VIP
- 《消毒供应质量控制指标(2024年版)》.docx VIP
- 股市主力操盘盘 口摩斯密码(原创内容,侵权必究).pptx
- 2012下半年深圳市机关公开招考公务员职位表.doc VIP
- 国际期刊科技论文写作与发表.PDF VIP
原创力文档

文档评论(0)