- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
巨型水库群防洪发电联合优化调度研究与应用.pdf
Journal of Water Resources Research 水资源研究, 2012, 1, 1-6
doi:10.4236/jwrr.2012.11001 Published Online February 2012 (/journal/jwrr.html)
Joint Operation of Flood Control and Hydropower
*
Generation for the Multi-Reservoir System
Shenglian Guo, Yu Li, Jionghong Chen
State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan
Email: slguo@
Received: Nov. 2nd th st
, 2011; revised: Nov. 18 , 2011; accepted: Dec. 1 , 2011
Abstract: Joint operation of flood control and hydropower generation for the Three Gorges cascade and
Qingjiang cascade reservoirs in China was studied in this paper. The flood control and hydropower genera-
tion models were established for individual and joint operation of the cascade reservoirs. The models have
considered reservoir flood prevention storage and electric compensation benefits among cascade reservoirs
and were solved by the progressive optimality algorithms. Four typical years of 1954, 1981, 1982 and 1998
of the Yichang hydrological stations were selected to derive the design flood hydrographs. The results show
that the average of Jingjiang River flood control standards can be raised to and 150-year and 168-year return
periods respectively. The daily inflow data of consecutive hydrological years of 1982-1987 were used to test
the models. Compared with the design operation rules, the joint operation of the multi-reservoir system can
generate 5.992 billion kWh of extra power annual or an increase of 5.37% by the objective function of max-
imum hydropower generation. Through re
文档评论(0)