- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Abstract
In mining engineering of underground mining belongs to high-risk operations. The stability
of slope or not, directly related to mining process in the safety of personnel and equipment. If the
different of mining geological structure, occurrence condition are not the same, The treat
governance slope stability situation is different too. This thesis Discuss the problem of Slope
stability. In Qianjia Ping vanadium deposit Huayuan Shaanxi LLC for the experiment slope of
845m background, After mine field sampling and corresponding rock indoor mechanics
experiments, find out the main orebody, mechanical parameters of surrounding rock by classical
load after theoretical calculation of ore mining depth known, the minimum width room tiberium
spikes and the mechanism analysis theory analysis by mutations in the width of instability
recovery ore room.
Using ANSYS software is built with mine slope structure experiment two similar between
column, the three-dimensional numerical model, different into FLAC3D finite difference
software, adopting Moore - coulomb failure criterion calculation. Mainly simulates the recovery,
in ore room slope gravity conditions, the stability conditions. Analyze the maximal principal
stress and Z direction stress and Z direction displacement of calculation results. Compare with
three kinds of parameters of the two models, it is concluded that the cloud is not the same in the
column width between similarities and cultures.
Establish a suitable for the features of ground pressure monitoring network system and
smooth completion of the monitoring system arrangement. The system includes vibration string
type borehole stress meter, multipoint displacement plan and convergence plan, combining
several methods of comprehensive utilization. In undergro
您可能关注的文档
最近下载
- 行政编制事业编制参公管理企业编制.doc VIP
- 参公、行政编制与事业编制的区别(修正版).docx VIP
- 22D701-3电缆桥架安装(26.9MB)(26.85MB)5ce2e72e69780631(1).pdf VIP
- 学堂在线 日语与日本文化 章节测试答案.docx VIP
- 危险化学品企业工艺平稳性关键SOP、一般SOP示例.pdf VIP
- 精密与特种加工技术(第3版):热作用特种加工技术PPT教学课件.pptx
- 公、行政编制与事业5编制的区别(修正版).doc VIP
- 港珠澳大桥主体工程桥梁工程钢箱梁制造新工艺及关键技术.ppt VIP
- 社区矫正心理测试.docx VIP
- 西双版纳傣自治州“十三五”规划研究报告.doc VIP
文档评论(0)