工厂品质改善团队.ppt

工厂品质改善团队,工厂改善提案案例大全,品质改善报告,品质改善报告ppt模板,品质改善计划,品质改善计划书,工厂改善提案案例,工厂品质标语,品质改善报告范文,品质改善方案

Opportunity During PCP/NPI stage, the quality of material PCBA boards are not stable: Average performance indicator - For material is 4627ppm, - For PCBA is 3259ppm . Objective Scope Objective: During PCP/NPI stage reduce material Fall Off Rate from 4627ppm to 2000ppm. During PCP/NPE stage reduce PCBA Fall Off Rate from 3259ppm to 2000ppm and ultimate achieve the aim 900ppm. Scope: Develop and formalize current quality control process in PCP stage to achieve high quality performance of new product. To try run on new model HTS9800, YDVS661 and MDVSC6001. Planning Schedule: Q

文档评论(0)

1亿VIP精品文档

相关文档