《Longterm stability analysis of largescale underground plant of Xiangjiaba hydropower station》.pdfVIP

《Longterm stability analysis of largescale underground plant of Xiangjiaba hydropower station》.pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
J. Cent. South Univ. Technol. (2011) 18: 511−520 DOI: 10.1007/s11771−011−0725−3 Long-term stability analysis of large-scale underground plant of Xiangjiaba hydro-power station 1 1 2 XU Wei-ya(徐卫亚) , NIE Wei-ping(聂卫平) , ZHOU Xian-qi(周先齐) , 1 1 3 SHI Chong(石崇) , WANG Wei(王伟) , FENG Shu-rong(冯树荣) 1. Institute of Geotechnical Engineering, Hohai University, Nanjing 210098, China; 2. Department of Building Engineering, Xiamen University of Technology, Xiamen 361024, China; 3. Mid-South Design and Research Institute, China Hydropower Consulting Group Co., Changsha 410014, China © Central South University Press and Springer-Verlag Berlin Heidelberg 2011 Abstract: Numerical analysis of the optimal supporting time and long-term stability index of the surrounding rocks in the underground plant of Xiangjiaba hydro-power station was carried out based on the rheological theory. Firstly, the mechanical parameters of each rock group were identified from the experimental data; secondly, the rheological calculation and analysis for the cavern in stepped excavation without supporting were made; finally, the optimal time for supporting at the characteristic point in a typical section was obtained while the creep rate and displacement after each excavation step has satisfied the criterion of the optimal supporting time. Excavation was repeated when the optimal time for supporting was identified, and the long-term stability creep time and the maximum creep def

您可能关注的文档

文档评论(0)

1318384917 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档