- 13
- 0
- 约4.96万字
- 约 35页
- 2018-04-12 发布于河南
- 举报
A Supply Chain Logistics Program for Warehouse Management 15.pdf
Chapter 14 Project Management, Interface, and Integration in an Existing Operation
or New Facility
Introduction
As people from outside the company join the design team e.g., architect, building construction
company, warehouse equipment vendor, WMS program company and warehouse integrator , the
prior team members ensure that the new team members have a comprehensive understanding of
both the existing and the proposed warehouse. After the design team has a clear understanding of
all aspects of warehouse business, as well as the proposed activities for the new warehouse, project
design events are scheduled and completed. These project events are: 1. Warehouse and WMS program integration and interface, which includes hardware and software, PCs, printers, server, network and hierarchy for a host computer, WMS computer, and warehouse computer 2. Project team organization and responsibilities 3. Master project schedule 4. Building design parameters 5. Warehouse design and drawing development 6. Project management and contract administration 7. Local government building design and drawing approval 8. Project brain-storming sessions 9. Project conference room pilot study 10. WMS business narrative that is based on a warehouse operation 11. PCs, printers, bar codes, and scanners/readers, which includes wireless and wire devices 12. WMS program development 461
? 2008 by Taylor Francis Group, LLC
462 n ?A Supply Chain Logistics Program for Warehouse Management 13. Description of operations and employee training program 14. WMS program supported and nonsupported transaction projections 15. WMS program equipment or transaction locations on warehouse drawings 16. Warehouse equipment specification and location drawing 17. WMS program business narrative and equipment changes 18. WMS program equipment bid and purchase 19. Building roof, walls, floor, utilities, and warehouse, and WMS program start-up and test 20. Testing and implement of a the building, b t
您可能关注的文档
- 438894 AEROSIL® for Water-based Coating.pdf
- 4741G_详细拆机.doc
- 4842.国外优秀信息科学与技术系列教学用书:C语言程序设计教程(翻译版)(附光盘).pdf
- 4_ nonverbal communication.ppt
- 4_Testing_the_Models_of_Stock_Price_Processes_Using_Monte_Carlo_Markov_Chain_Method.pdf
- 4_WinCC flexible 2016 - Basics_Communication_EN.pdf
- 5 - Distributed Transducers for Active Control of Vibration.pdf
- 5 Crane and Lifting 起重作业.ppt
- 5 non-verbal_communication2.ppt
- 5-STEPOVERVIEW(COMPAQ客人才).ppt
- 2026年长春事业单位联考备考题库发布时间有完整答案详解.docx
- 2026广西北海市合浦县民政局招录城镇公益性岗位人员11人备考题库及答案详解(最新).docx
- 2026江苏南京邮电大学招聘(人事代理)4人备考题库(第二批)精编答案详解.docx
- 2026年湖口县公安局交通管理大队公开招聘交通协管员备考题库完整答案详解.docx
- 2026年长春事业单位联考备考题库发布时间及一套答案详解.docx
- 2026年福建莆田市公安局城厢警务辅助人员招聘13人备考题库及参考答案详解1套.docx
- 2026广东佛山狮山镇大圃诚聘地理美术化学英语教师备考题库及答案详解(考点梳理).docx
- 2026广东中山市公安局南头分局招聘辅警3人备考题库完整答案详解.docx
- 2026年芜湖市文化和旅游局所属事业单位公开招聘编外聘用人员备考题库及答案详解参考.docx
- 2026广西北海市合浦县纪委监委招录公益性岗位人员1人备考题库及答案详解1套.docx
原创力文档

文档评论(0)