Avaya Avaya Communication Server 1000 for Avaya Aura Implementation Exam 7003-1题库.pdfVIP

  • 12
  • 0
  • 约8.39千字
  • 约 7页
  • 2018-04-03 发布于河南
  • 举报

Avaya Avaya Communication Server 1000 for Avaya Aura Implementation Exam 7003-1题库.pdf

Avaya Avaya Communication Server 1000 for Avaya Aura Implementation Exam 7003-1题库.pdf

s@lm@n Avaya Exam 7003-1 Avaya Communication Server 1000 for Avaya Aura? Implementation Exam Version: 6.5 [ Total Questions: 65 ] 买题库 QQ:座机电话号码7 Avaya 7003-1 : Practice Test Question No : 1 A technician deployed a Communication Server 1000E with dual homing feature configured. Both the T and 2T ports are connected on the media Gateway Controller MGC one connection is active to avoid network loops. Which two statements are true, if the connection to the active port on the MGC is host Choose two A. The MGC will issue a link down error. B. The MGC will switch to the active pert. C. The MGC and CPPM will have no loss of service. D. The MGC will switch to the active port after 12 seconds. Answer: B,C Question No : 2 A customer has deployed a Communication Server 100 Rls. 7x system at their site. The technician has been asked to add the Call pickup feature to the 100 IP telephone in the sales department. The customer wants to be sure active calls not lost when the changes are made. Which Phones Configuration feature can be enabled that will ensure changes to the telephone are not transmitted to the call server until the telephone are busy A. Bulk change B. Courtesy change C. Group change D. Template change Answer: B Question No : 3 A customer wants to build a new Ip node on their Communication Server CS 1000E system with three Signaling Servers. This node will support virtual trunks, IP media services, TPS and personnel directories. A technician logs into Elements manager to 2 买题库 QQ:座机电话号码7 Avaya 7003-1 : Practice Test complete the configuration, after creating and saving the node configuration, the transfer now option chosen, then the servers are selected, the start sync is selected followed by restart application. What is expected outcome from the system A. The node file will be transferred from Signaling Servers to the call servers, and INI files will be transferred from the call server to the selected servers. B. The node file will b

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档