网站大量收购闲置独家精品文档,联系QQ:2885784924

《1997 Rescheduling job shops under random disruptions》.pdf

《1997 Rescheduling job shops under random disruptions》.pdf

  1. 1、本文档共18页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《1997 Rescheduling job shops under random disruptions》.pdf

int j prod res vol no . . . ., 1997, . 35, . 7, 2065± 2082 Rescheduling job shops under random disruptions * R. J. ABUMAIZA R² and J. A. SVESTKA In this work, an algorithm for rescheduling the a ected operations in a job shop is presented and its performance, with respect to measures of e ciency and stability, is compared with that of Total Rescheduling and Right-Shift Rescheduling. Algorithms f or all three methods are implemented in a rescheduling program which, based on keyed-in disruption inf ormation, produces three new schedules and outputs their related performance measures. A designed f actorial experiment is performed on benchmark scheduling problems to study the e ect of di erent rescheduling methods as well as various problem characteristics and disruption scenarios on the perf ormance of the new schedules. The results demonstrate that the A ected Operations Algorithm overcomes the disadvantages associated with other rescheduling methods. Key terms used in this paper DownMachine: This term refers to the disrupted machine, i.e. the machine on which the disruption occurs. DownTime: This time refers to the duration of the disruption. Initial Schedule: This is the disrupted schedule which requires rescheduling .1 Rescheduling: This refers to the process of ® nding a new schedule upon the occurrence of a disruption in the operations of an on-going initial schedule such that the technological constraints remain viable and the performance criteria are still optimized. New Schedul

文档评论(0)

wgvi + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档