Schedule control model for linear projects based on linear scheduling method and constraint programming》.pdfVIP

  • 17
  • 0
  • 约 16页
  • 2015-11-22 发布于河南
  • 举报

Schedule control model for linear projects based on linear scheduling method and constraint programming》.pdf

Schedule control model for linear projects based on linear scheduling method and constraint programming》.pdf

Automation in Construction 37 (2014) 22–37 Contents lists available at ScienceDirect Automation in Construction jour nal homepage: www.el sevie r. com/ locate/ autcon Schedule control model for linear projects based on linear scheduling method and constraint programming Yuanjie Tang a, Rengkui Liu a,⁎, Quanxin Sun b a State Key Laboratory of Rail Traffi c Control and Safety, Beijing Jiaotong University, No. 3 of

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档