multi purpose.docxVIP

  • 8
  • 0
  • 约 8页
  • 2015-12-19 发布于浙江
  • 举报
multi purpose

 PAGE \* MERGEFORMAT 8 Development history Within 12 months the design consortium leader Neptun - Stahlkonstruktions GmbH and its main partners NE (Rostock), WIG (Wismar) and IMTECH worked out a detailed TRIBON 3D-model enabling the TRIBON – linked yard to start the series. The first delivery took place at beginning of November 2009 with Hull no. 551 - M/V ‘Lisbon Trader’. Further 6 vessels have been delivered until end of August 2010. For all the delivered vessels time charters have been fixed by GB Shipping / Leer. Steel structure The ship’s body was designed to ensure sufficient fat

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档