ConversionofRevolution200TtoNativeMAIDsystemfor.docVIP

ConversionofRevolution200TtoNativeMAIDsystemfor.doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ConversionofRevolution200TtoNativeMAIDsystemfor.doc

Processes to convert a Revolution 200T VTL system to a Native MAID system for Veritas testing. Equipment: CAB10025 Current system configuration: 1x8, SuperMirco, 200T VTL system 1.3.r.14 FS 1069 STK L700 (8) STK 9840 (56) Day one: Installation Inspect the system once it has been delivered. Insure there has been no shipping damage to the shipping containers. Unpack the cabinet and move it into position in the Product test area. Remove the doors, and perform a visual inspection of the cabinet. Insure it was correctly disassembled for shipping. Also verify that no internal damage occurred during shipping. Inspect each mid-plane connector on each shelf for damage. Clean the inside of the cabinet, remove any dust, dirt or debris that is inside. Connect AC1 and AC2 line cords to the power rail Move the eight Canister shipping containers along side the South wall of the Product test area. Open and inspect the shipping containers inside for damage. In an ordered sequence, remove the Canisters for a specific shelf from their shipping containers. Inspect the connectors on each Canister for damage or debris. If none, insert the Canister into the correct slot in the shelf. Insure that there is a positive fit and that the locking mechanism engages. Repeat this process for each shelf. Install the Rack controller the 4 SCSI drives into the SuperMirco server. If it was packed correctly, they should be labeled for the slots they go into. Install the four, 48VDC power supplies into positions P2, P3, P4 and P5 (right to left). Install and connect the network switch on the top of the cabinet. Install the Copan banner and connect it. Allow the system to set in the environment overnight. Day two: VTL system verification and IOP331 upgrade Turn on the main AC circuit breakers in the cabinet. Insure the KVM switch is selected to AC1 or AC2. Open up the KVM and enterfor the password. To insure a quick boot, connect a network cable to the RC0-NET0 connector. Turn on the Rack co

文档评论(0)

***** + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档