Appendix-VI.docVIP

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Appendix-VI.doc

Appendix- VI Procedure for calculation of Transmission System Availability Transmission System Availability shall be certified by Member Secretary, RPC of the region concerned separately for each AC and HVDC Transmission System for which transmission charge is payable by a particular long-term transmission customer or is shared by same set of long-term transmission customers. The transmission elements shall be grouped into following categories for the purpose of calculation of availability of Transmission Systems : AC transmission lines: Each circuit of AC transmission line shall be considered as one element. Inter-Connecting Transformers (ICTs): Each ICT bank (three single phase transformer together) shall form one element. Static VAR Compensator (SVC): SVC along with SVC transformer shall form one element. However, 50% credit to inductive and 50% to capacitive rating shall be given. Switched Bus Reactor: Each switched Bus Reactor shall be considered as one element. HVDC Bi-pole links: Each pole of HVDC link along with associated equipment at both ends shall be considered as one element. HVDC back-to-back station: Each block of HVDC back-to-back station shall be considered as one element. If associated AC line (necessary for transfer of inter-regional power through HVDC back-to-back station) is not available, the HVDC back-to-back station block shall also be considered as unavailable. The Availability of AC and HVDC portion of Transmission system shall be calculated as under: % System Availability for AC system o X AVo + p X AVp + q X AVq + r X AVr = ------------------------------------------------------------ X 100 o + p + q + r % System Availability for HVDC system s X AVs + t X AVt = ---------------------------------- X 100 s + t Where o is Total number of AC lines. AVo is Availability of o number of AC lines. p is Total number of switched bus reactors . AVp is Availability of p number of

文档评论(0)

***** + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档