网站大量收购闲置独家精品文档,联系QQ:2885784924

变形监测在基坑监测中的应用.doc

  1. 1、本文档共29页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
变形监测在基坑监测中的应用.doc

毕 业 论 文 目:变形监测在基坑监测中的应用 摘 要 随着中国经济现代化建设的飞速发展,各种大型建筑物此起彼伏。如今,变形监测是测绘工程研究的热点问题,由于受地质自然环境等因素的影响,基坑施工过程中必然会产生一定的位移,极易出现安全事故。 关键词:基坑变形监测,水平位移监测,沉降监测,周围环境监测 Abstract With the rapid development of the construction Chinas economic modernization, various large buildings have been built one after another.Nowadays, the deformation monitoring is a hot topic in the research category of Surveying and mapping engineering, the foundation pit deformation monitoring is an important part of the deformation monitoring. Foundation pit deformation monitoring plays a pivotal role on the course of the construction of foundation pit, the main contents of monitoring is the monitoring of horizontal displacement of the retaining structure, settlement monitoring, stress monitoring and underground water level monitoring and protection of the slope monitoring and the surrounding environment monitoring. Because of geological conditions, natural environment and other factors, pit construction process will inevitably produce a certain displacement, prone to accidents. In this paper, I wrote in Nanchang on Jane Bay project, at the early stage, first establish a control network, control points away from the pit and choose less prone to easy observation of the deformation region, Then according to the control point to benchmark layout, level layout in around the foundation pit support slope and buried good inclinometer tube, with the excavation of foundation pit, in a fixed period of were observed.Finally, according to the data obtained is calculated to obtain the amount of displacement of each cycle. If the amount of displacement within the prescribed limits, you can continue with the work, if the amount of displacement exceeds a predetermined limit on the construction side it will have to provide early warning and improve construction program. Key words:Monitoring of deformation of foundation pit, displacement monitoring, subsidence monitoring, surrounding environment monitoring 目 录 1

文档评论(0)

我的文档 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档