ResearchonControlandConstructionTechnologiesfor.PDFVIP

ResearchonControlandConstructionTechnologiesfor.PDF

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ResearchonControlandConstructionTechnologiesfor.PDF

Hans Journal of Civil Engineering 土木工程, 2015, 4, 1-7 Published Online January 2015 in Hans. /journal/hjce /10.12677/hjce.2015.41001 Research on Control and Construction Technologies for Confined Water in Supper Deep Foundation Pit 1 2 2 Hongjun Li , Jie Zhang , Hongyi Li 1 Beijing Urban Construction Huaxia Foundation Construction Engineering CO, LTD, Beijing 2 Department of General Construction Contract, Beijing Urban Construction Refco. Group CO, LTD, Beijing Email:163.com nd th rd Received: Nov. 22 , 2014; revised: Dec. 24 , 2014; accepted: Jan. 3 , 2015 Copyright © 2015 by authors and Hans Publishers Inc. This work is licensed under the Creative Commons Attribution International License (CC BY). /licenses/by/4.0/ Abstract According to the characteristics of a dewatering engineering for the deep confined water founda- tion pit in Beijing, tube well precipitation is selected and the design parameters of well spacing in 8 m and 36 m are proposed. The construction measures as partition closed, temporarily closed, etc. are put forward to reduce the difficulty of precipitation construction creatively. To verify the ra- tionality of the design, the underground water table and peripheral subsidence are monitored. Finally, the secondary utilization scheme of well water is put forward to improve the utilization efficiency of groundwater, which is accord with the concept of green construction. Keywords Deep Foundation Pit, Confined Water, Dewatering, Groundwater Control 超大深基坑工程承压水控制设计 及施工技术研究 1 2 2 李红军 ,张 洁 ,李洪毅 1北京城建华夏基础建设工程有限公司,北京 2北京城建集团有限责任公司建筑工程总承包部,北京

文档评论(0)

***** + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档