- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
DownloadWordFile.doc
Section 08 39 18
PERMANENT GLASS FLOOD BARRIERS
PART 1 GENERAL
RELATED DOCUMENTS
Drawings and general provisions of the Contract, including General, Special and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.
SUMMARY
This Section includes the following:
Permanent glass flood barriers
Exterior entrance systems.
Exterior storefront systems.
Related sections include the following:
Division 7 Section ‘’Building Insulation’’ for firesafing field installed in conjunction with glazed aluminum entrances and storefront system.
Division 7 Section ‘’Joint Sealants” for joint sealants installed as part of glazed aluminum entrances and storefront system.’
Division 8 Section “Structural Glazed Aluminum Curtain Walls”
Division 8 Section ‘’Glazing’’
1.03 SYSTEM DESCRIPTION
General: Provide (4) four sided structural glazed aluminum FLOOD PANEL system that has the following capabilities based on testing manufacturer’s standard units in assemblies similar to those indicated for this project:
Withstands loads, thermal and structural movement requirements indicated without failure.
Air infiltration and water penetration exceeding specified limits.
Framing members transferring stresses, including those caused by thermal and structural movement, to glazing units.
Flood Loads for flood barriers must meet those expressed by FEMA Technical Bulletin 3-93 for Non -Residential flood Protection and must be manufactured to US ARMY Corps Of Engineers ‘Flood Proofing Regulations’ to meet performance for Type 2 Closures as identified in Chapter 7, Section 701.1.1
System must be able to be reglazed from the exterior.
Wind Loads: Provide glazed aluminum entrances and storefronts system, including anchorage, capable of withstanding wind-load design pressures calculated according to requirements of authorities having jurisdiction, and the American Society of Civil Engineers’ ASCE 7, “Minimum Design Loads for Buildings and Other Structures,” 6.4.2, “
您可能关注的文档
- CS315ComputerLogicandDigitalDesign.ppt
- CSC425525ExtraNotesonChapter2LogicandFirst.doc
- CSCI2610-DiscreteMathematics.ppt
- CSE-221DigitalLogicDesign(DLD)-DUET.ppt
- CSE1520ComputerUseFundamentals.ppt
- CSE2341DigitalLogicCircuits.ppt
- CULTURALRESOURCESINDICATORS.ppt
- CURRICULUM-HigherEducationCommission.doc
- CurriculumGrids7-12-math123.net.doc
- CurriculumMap.doc
- DR250InstallationandOperatorsManual2.9MB.doc
- DraftTenderDocument-CARICOMSecretariat.doc
- DraglinesandClamshells.ppt
- DRAWINGTERMS&CONCEPTSDEFINED.doc
- DrillingOperations.ppt
- DrillingproceduresOMCAB-omcab.eu.doc
- DucatiSTFAQ-DucatiWiki.doc
- eastawayhandout_0.doc-TheRoyalInstitution.doc
- EditionJune2009SpecificationPart1050RailandRail.doc
- EE208Chapter2-BooleanAlgebraandLogicGates.ppt
文档评论(0)