- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
JREPosiModificationInstructionsV2Removethe8Torx.doc
JRE Posi Modification Instructions V2
Remove the 8 Torx Bolts holding the two posi halves together. You will need an E18 Socket. Note: Do not worry about orientation of the case because it can only be installed one way. This is because the two halves of the case utilize a roll pin that engages in both case halves.
Were going to remove both stacks of clutches and put them aside temporarily.
The two side gears and two spider gears have bumps cast in and will have to be modified on a belt sander to make the gear face surface flat. (This modification will make sure that there will be no wear on the new preload spring that will be added later in these instructions)
Your gears will now look this, notice how they are flat and have no casting marks in them.
Now we go back to the Clutches. Out of the original clutches, you will be using one clutch steel and one double sided friction from each clutch pack. All else will be discarded.
Take your new clutch packs and stack them as follows onto the side gears. 1st Single Sided Friction with friction surface facing up then alternate steel, double sided friction, steel, original double sided friction, and original steel. Your new clutch pack will be approximately .530 inch thick. Repeat for other side gear. (NOTE: Soak friction surfaces with posi additive )
Lower one pack and gear assembly into housing as shown.
Next slide pre-load spring over cross pin and reinstall spider gears being certain to line up hole in cross pin with the hole in the side case.
Then stack remaining side gear and clutch pack assembly as shown.
Lower last case halve over the clutches lining up ears on steels with recess in case halve being sure to line up roll pin into the cross pin.
Carefully flip entire assembly over, reinstall 8 case halve bolts with loctite red. Snug assembly together in a criss cross pattern. Finally torquing bolts. They should be torqued in three stages. 35 Ft lbs first, followed by 45 Ft lbs and finishing with 55
您可能关注的文档
- GeometryUnitPlan2–ReasoningandProof{Logic}.doc
- GeorgeBoole.ppt
- GeorgeBoolebyBinnurGorer-DepartmentofComputer.ppt
- GETRAGInterview-RubberChickenRacingGarage.doc
- GettingClosertoIconicLogic-IDt.doc
- GettingtotheBuriedInterface.ppt
- GISAnalysisFunctions(part1)-SantaMonicaCollege.doc
- GL1200EngineRemovalForStatorReplacement.doc
- GLOSSARYOFFLEXOGRAPHICPRINTINGTERMS.doc
- GoatsintheWoods-DepartmentofNaturalResources.doc
- June3,2002.doc
- JuumaBevel-UpPlanes-FineTools.PDF
- Juvenilesalmonidotolithextractionandpreparation.PDF
- JWNCseriesflatbedcuttingplotter,whatistheautomatic.doc
- KarolVasilkoKinematicsAnalysisoftheMovement-TUKE.PDF
- KawasakiMetalCuttingCircularSaw-840328-AlltradeTools.PDF
- kim_childs03.ppt.ppt
- Kleene'sandukasiewicz'sthree-valuedlogicKleene's.ppt
- KLEENEALGEBRAANDMODALLOGICMichiroKONDO1.PDF
- KONA–Cutthrough.ppt
文档评论(0)