- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ToyAirplaneManufacturing.doc
Toy Airplane Manufacturing
Mini Project
Christian Mickelson
Ted Pelzer
Todd Madole
IE 4235
Case Study 1: Toy Airplane Manufacturing
A toy company produces three types (A,B and C) of a toy aluminum airplanes in the following daily volumes: A=1000 B=1500 and C=1800. The company expects demand to increase for its products 30 percent over the next six months and needs to know the total machines, AGV’s and operators that will be required. All planes go through five operations except for plane A, which skips the cutting operation. Following is a list of operation times, move times and resources used:
After die casting, planes are moved to each operation in batch sizes of 24. Input buffers exist at each operation. The factory operates eight hours a day, five days per week. The factory starts out empty at the beginning of each day and ships all parts produced at the end of the day. The die caster experiences downtime every 30 minutes exponentially distributed and takes 8 minutes normally distributed with a standard deviation of 2 minutes to repair. One maintenance person is always on duty to make repairs.
Model Building and Assumptions:
The .47 grinding time was ignored in the data set because it is a statistical outlier that does not fit the rest of the data. It can be assumed that this time was caused do to some non- regular operating error. It was also assumed that the AGVs move the appropriate speed and distances required for the given move times. Batches consist of 24 planes of the same type. Operation times are the same for each type of plane and any change over in tooling is also assumed in the operation time. Each machine requires at least one operator. Additional operators would be required depending on how the company applies benefits and break times. Each simulation model also includes a system that reorders more raw materials when 6 planes are added to scrap.
As-Is Model
First an as-is model was constructed for the facility. Initially, the team viewed
您可能关注的文档
- TeachingAlgebraicThinkingtoAllChildrenThrough.doc
- TeaIndustryWorkers-MinistryofLabour,Industrial.doc
- technicalassistance2012-EasyKart.co.uk.doc
- Technicaldifficulties-CEA.doc
- TechnicalGuideforGlassCutting-MacInnesTool.PDF
- Technicalspecification.doc
- Technicalspecifications-Porsche108.doc
- TechnicalSpecifications.doc
- TechnologicalImpacts.ppt
- TechnologyofPrintingInksRawmaterialsandformulations.doc
- TRADE-OFFBETWEENCLUTCHSIZEAND-CiteSeer.PDF
- Traditionsince1924ASAMIasi.PDF
- TrannySwapHowTo-STINGERPERFORMANCE.doc
- Transistors,LogicGatesandKarnaughMaps-LaSalle.ppt
- Transmission,Manual,ModelS5-47ZF-TheDieselStop.com.doc
- Transmissionshaftproduction-GST-Gesellschaftfür.PDF
- TransmissionTechnologyCatalog-SUCOTechnologiesInc.PDF
- TRECOLOCOCO-References.doc
- TreeRootGrowthAfterPlanting-EnvironmentalHorticulture.ppt
- TRIZUPDATEFORS.C.JOHNSON-Innovation-TRIZ.ppt
文档评论(0)