Load shedding scheme for the two-area system with linear quadratic regulator.pdfVIP

  • 12
  • 0
  • 约4.22万字
  • 约 13页
  • 2016-01-18 发布于湖北
  • 举报

Load shedding scheme for the two-area system with linear quadratic regulator.pdf

Load shedding scheme for the two-area system with linear quadratic regulator.pdf

Front.Energy2013,7(1):90—102 D0I1O.1007/s11708—012—0224—8 D.TYAGI,AshwaniKUMAR,SaurabhCHANANA Loadsheddingschemeforthe O·area syste‘m w0it。h0 I●0inear quadraticregulator ◎ HigherEducationPressandSpringer-VerlagBerlinHeidelberg2013 Abstract Thepowersystem ispronetomanyemergency tothelossofsynchronicity,thereby,thecollapseofthe conditionswhichmayleadtoemergencystateofoperation system.Therefore,therfequencyofhtesystem mustbe withdecayinthesystem frequency.Thedramaticchange controlledtoacertainextentsothatthesystem remainsin in the frequency can resultin cascaded failureofthe s

文档评论(0)

1亿VIP精品文档

相关文档