- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
谢谢大家! * * * This is the Work Management Process Flow diagram. It represents DuPont’s best practice for how to get work done and keep good records. Lead the class through the flow diagram step by step making sure they understand each step and how it relates to the steps around it. Work Id is referred to as a Notification, some places this is a Request for Work. Once Maintenance accepts the Notification or Request it becomes a Work Order. These are assigned a unique identification number or code so they can be more easily tracked. Work has to be prioritized for the planners so they know which one to work on first. Since all work has to be authorized an estimate of the cost has to be prepared. Once authorized the WO gets planned, put in backlog and then scheduled. Once scheduled the mechanics do the work and feed back some record of what they did (if only the time spent). The work order is then marked complete and eventually closed. These are the main record of both equipment failure and repair work so the better they are the more accurate the analysis of it. This is the end of the second section. * * * * * * * * * * * * * * Copyright ? 2010 DuPont. All rights reserved. The DuPont Oval Logo, DuPont?, and The miracles of science? are registered trademarks or trademarks of DuPont or its affiliates. * Copyright ? 2010 DuPont. All rights reserved. The DuPont Oval Logo, DuPont?, and The miracles of science? are registered trademarks or trademarks of DuPont or its affiliates. 法兰垫片的安装与锁紧 陈章博-2014/09/22 Safety Contact 安全经验分享 每一件小事均与团队的素质、企业的文化紧密相关 安全暂停 课程内容 -法兰垫片的安装与锁紧 安全事项 移除垫片 螺丝与螺帽 法兰检查 上紧程序 螺丝负荷 测漏 螺帽因子 九标准法兰的扭力值 (建议) 9.1 范围 9.2 紧密度 9.3 筛选指标 9.4 扭力表? (1)安全事项 1.1 在移除垫片时,需遵守工厂安全程序,确定阀门关闭上锁、无压力、液体残留,而且在某些场合,个人防护用品如:手套、眼镜、挂勾、鞋等均需穿着。 ? 1.2 需再经变更整理后,方可改变特定垫片。 ? 1.3 拆螺丝前,确认法兰有支撑且尽可能由远离设备端拆第一根螺丝。? 1.4 在危险介质管件中,欲拆之螺丝已严重锈蚀且不易折除时,通常一次只拆一根螺丝,以免法兰不受控的裂开,然而此种情况仅限于系统降压且停车、移走螺丝将会加大泄漏之可能,且应被视为开管作业,应配戴适当PPE。 1.5 法兰垫片及螺丝角可能因过度上紧而受损。 1.6 设备法兰若螺丝大于1寸且数目众多时,易因用人力上紧需出大力且多用加力杆加
文档评论(0)