- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
第十章第二节船体结构
______ is not a longitudinal structural member结构构件.A.sideshell B.bottom shell platingC.inner bottom plating D.transverse bulkhead
______ is not a static .A.Actual weight of the ships structure,outfitting,equipment and machineryB.Ballast load(weight)C.Cargo loadD.Slamming and sloshing load
A block and tackle is rove to advantage.This means that the ______.A.blocks have been overhauledB.hauling parts of two tackles are attachedC.hauling part leads through the movable blockD.hauling part leads through the standing block
A carling is used aboard ship ______.A.As a connecting strap between the butted ends of platingB.To stiffen areas under points of great stress between beamsC.To prevent the anchor from fouling when the brake is releasedD.To provide an extra heavy fitting in a heavy lift cargo rig
A continuous watertight bulkhead is normally also a(n)______.A.Structural bulkhead B.Exterior bulkheadC.Centerline bulkhead D.Joiner bulkhead
A deck fitting,used to secure line or wire rope,consisting of a single body with two protruding horns is called a ______.A.Bitt B.Bollard C.Capstan D.Cleat
一个甲板装置,用于固定绳索或钢丝绳,由具有两个突出角的单体组成的叫系索耳(羊角)。
A design modification of an anchor chain which prevents kinking is the ______.A.Detachable link B.Stud link C.Kenter link D.Connecting link
A set of interior steps on a ship leading up to a deck from below is known as ______.A.A companion way B.Tween-decksC.Stairs D.Any of the above are acceptable
A term applied to the bottom shell plating in a double-bottom ship is ______.A.bottom floor B.outer bottom
C.shear plating D.tank top
A vessel has sustained damage in a collision with another vessel.It is necessary to have a Seaworthy Certificate before the vessel sails.Who will issue this certificate ________.A.American Consul B.Classification SocietyC.Captain of the Port D.Officer in Charge,Marine Inspection
Bilge keels
您可能关注的文档
最近下载
- 《国际贸易外汇管理》课件.ppt VIP
- 《企业外汇管理法规》课件.ppt VIP
- 和利时LK大型PLC指令手册.pdf VIP
- 浅析莫扎特《C大调小奏鸣曲k.545》的音乐风格与演奏技巧.docx
- 2022年人教版九年级全一册物理同步教学教案.doc VIP
- 湘质监统编2020表格机器转换word版(房屋建筑工程竣工验收技术资料统一用表).docx
- 海关通关业务介绍幻灯片.ppt VIP
- 湘质监统编2020表格机器转换word版(市政基础设施工程竣工验收技术资料统一用表).docx VIP
- Roland罗兰乐器TD-11 电鼓音源TD-15 TD-11 用户手册用户手册.pdf
- 垃圾焚烧发电行业自动监控数据应用综合题库.docx VIP
文档评论(0)