- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Analysis on the Pre-qualification System of
Construction Project Bidding
XU Bing
Abstract: The pre-qualification is an important work in the process of bidding projects.Its aims are to choose a qualified bidder who has experience, competence, reputation to undertake the project. However, there are a lot of problems in Chinas current tender work.Based on related laws and engineering practice activities in the area of project bidding, this paper analyses the status, problems and their causes of pre-qualification in the process of project bidding. On the basis of comparing with some mature foreign practices,this paper put forward corresponding recommendations about improving Chinas pre-qualification system.
Keywords: bidding; pre-qualification; Construction Project
I. INTRODUCTION
The pre-qualification in the process of bidding projects is a activity that before sending invitation for bids or selling bidding documents,tenders inspect bidder Candidates’ qualifications,performance,skill level, financial status and so on,according with predetermined criteria of qualifications and select the qualified bidders.
One of its fundamental aims is to review whether the potential bidders have experience, competence, reputation to undertake the project. On the other hand, controlling the number of bidders in a certain range ensures that the competitive efficiency of bidding activities, and reduces the workload of the tenders evaluation.
In Chinas current tender work, on the one hand confusing the role of pre-qualification, and weakening the functions of bidding evaluation and calibration; on the other hand, there are also some defects in pre-qualification, such as non-specific applicable conditions, unclear review content, more subjective assessment method the lack of corresponding system protection and so on, which make the normative work to the pre-qualification system is very important.
II.THE EVOLUTION OF PRE-QUALIFICATION SYSTEM OF CONSTRUCTION PR