年产160万吨熟料舜岳水泥厂设计—重点设计:水泥粉磨 毕业论文.doc

年产160万吨熟料舜岳水泥厂设计—重点设计:水泥粉磨 毕业论文.doc

  1. 1、本文档共89页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
本科毕业设计说明书 年产160万吨熟料舜岳水泥厂设计—重点设计:水泥粉磨 THE PRODUCTION OF CLINKER PER YEAR 1.6 MILLION TONS OF SHUNYUE FLY ASH CEMENT PLANT DESISN —KEY DESIGN:CEMENT DESIGN 学院(部):   材料科学与工程学院   专业班级: 无机非金属材料工程07-3班 学生姓名: 指导教师: 2011 年 6 月 1 日 年产160万吨熟料舜岳水泥厂设计 THE PRODUCTION OF CLINKER PER YEAR 1.6 MILLION TONS OF FLY ASH CEMENT PLANT DESISN —KEY DESIGN :CEMENT DESIGN ABSTRACT This design is in jiangsu, xuzhou TongShanXian which is to build a annual 1.6 million tons clinker cement plant. In the design process, I consulted a lot of cement plant design examples, and integrates theoretical experience data, but still have many shortcomings exist, please forgive me. Briefly below the cement plant design processes of the shipunloaders. First, the factory before choosing should be have a good site. Site choice reasonable or not will affect plant construction investment, investment production and future development. Therefore, the site selection should pay great attention to. Site choice work is a comprehensive work which need many related technical personnel to participate in, generally include: technical economy profession, the assembly drawing transportation professional, raw materials professional, mining professional and process engineering, waterway professional, environmental protection professional, electrical major, etc. Next, I would like to make time layout. The stand or fall of plant layout will affect the cement production process. In layout design process needed to consider the factors, such as reasonable decorate, many economic optimum, compact structure, function modular, etc, which need to be aware of and wind factors. The reasonable layout requirements placed on the lower end of the wind stacking the edge, and factory should ensure the environmental health of the factory strictly. Thirdly, I want to conduct process equilibrium calculation, including material balance, host balance and depositories balance. Among them material

文档评论(0)

绿风 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档