废水处理系统调试 Commissioning procedure of Wastewater Treatment system.docVIP

废水处理系统调试 Commissioning procedure of Wastewater Treatment system.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
PLTU 1 JAWA BARAT (INDRAMAYU) 3X330MW POWER PLANT Commissioning procedure of Wastewater Treatment system No.TPRI-TSCS-H004 CUSTOMER PT.PLN (PERSERO) PT.PLN ENJINIRING EPC CONTRACTOR SCP JO Xi’an Thermal Power Research Institute Co., Ltd. 批准 APPR. 日期 Date for PLN JMK Approved 审核 Check 日期 Date 校准 Calibrate 日期 Date 版次 REV. 日期 Date Compiled by: Zhang Ruixiang Reviewed by: Teng Weizhong Approved by: Sun Ganghu Content 1 compiling basis 2 commissioning scope of wastewater treatment system 3 conditions before commissioning 4 commissioning content 1 compiling basis 1.1 Standard of quality inspection and evaluation for integrated commissioning of thermal power plant project, 1996 1.2 Work specifications of startup and commissioning for thermal power plant project, 1996 1.3 Drawings and manual instructions provided by the manufacturer. 2 commissioning scope of wastewater treatment system 2.1 commissioning of industry wastewater treatment system 2.2 commissioning of domestic sewage treatment system 2.3 commissioning of wastewater containing coal treatment system 2.4 commissioning of oily wastewater treatment system 3 conditions before commissioning 3.1 civil team should finish the following work: 3.1.1 civil work of each wastewater treatment system has been finished complying with the design requirements. 3.1.2 Construction of necessary anticorrosive equipments has been finished and drainage ditch is unobstructed. 3.2 civil team should finish the following work: 3.2.1 Installation of equipments, pipes, valves, chemical dosing tank for each wastewater treatment system has been finished complying with the design. Each kind of valves act smartly and the tightness of them meets the requirements. 3.2.2 calibration of system online instruments meets the requirements. Installation and commissioning work has been finished. Online supervision can be put into service. 3.2.3 Construction of power, construc

文档评论(0)

绿风 + 关注
实名认证
文档贡献者

教师资格证持证人

该用户很懒,什么也没介绍

领域认证该用户于2024年11月27日上传了教师资格证

1亿VIP精品文档

相关文档