- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
交通工程专业英语--7-25课文
Unit 7 Economics and Transportation Engineering
Text
An economic analysis should not be carried out as all afterthought.It should be used as part of a continuous process,starting with the objectives of the prposed transportation project (can these objectives be satisfied in any other way?),running through the entire planning and design process,and only ending,as a final summing up,with the overall evaluation. It should consider the following questions:Project identification. Which projects or policies should be considered as possible solutions to a particular transport need?
②Establishing rough priorities.Which projects and policies should be considered in detail?Detailed evaluation.Which costs and benefits are relevant to the evaluation,how should they be measured,and how can they best be presented as an index of priority?Project selection.Should this project be selected,should it be rejected,or should it be postponed?Economics is often overlooked as an aid to transportation planning and design.Yet any transportation engineering problem involes a whole series of essentially economic decisions.In the area of design,for example,the transportation engineer must choose materials,select an overall design concept,and then combine the component parts of the scheme into an effective,and economical,whole.A river crossing could thus be by ferry boat,causeway,or bridge.In the latter case it could be in steel,concrete,or timber.It could be suspended,arched,or simply supported.What should the engineer choose?The range of choice is not usually as large as this.Some soutions will be physically infeasible (e.g.,by lack of suitable foundations for an arched bridge), but important choices will remain.In the absence of a rigorous economic analysis,the designer may make these choices on the basis of:Experience,which may or may not cover an adequate range of options.Preconceptions as to what is desirable (e.g., one solution uses less material).An innate view of mathemat
您可能关注的文档
- 二协整分析的模型和方法.doc
- 二季度沪铜投资策略报告.doc
- 二年级上册语文综合评价试题(人教版).doc
- 二年级下语文说课21清澈的湖水人教版.doc
- 二年级数学上总复习.doc
- 二年级数学上册期末复习册(全面).doc
- 二手房交易的详细流程及注意事项.doc
- 二年级(下)数学教案全册.doc
- 二期塔吊基础方案 Microsof.doc
- 二极管正负极判定方法.doc
- 2019-2020学年北京市东城区五上期末语文试卷.docx
- 2019-2020学年北京市房山区六下期末语文试卷.docx
- 2019-2020学年北京市房山区三上期末语文试卷.docx
- 2019-2020学年北京市房山区五年级下册期末语文试卷.docx
- 2019-2020学年北京市丰台区六上期末语文试卷.docx
- 2019-2020学年北京市丰台区三年级(上)期末语文试卷.docx
- 2019-2020学年北京市丰台区三上期末语文试卷.docx
- 2019-2020学年北京市丰台区四年级(上)期末语文试卷.docx
- 2019-2020学年北京市丰台区四年级(下)期末语文试卷.docx
- 2019-2020学年北京市丰台区四上期末语文试卷.docx
最近下载
- 标准图集-陕09J01-建筑用料及做法.pdf VIP
- 2025年江苏省事业单位综合知识与能力素质(经济统计类)模拟试卷.docx VIP
- 2025年度民主生活会五个带头个人对照检查(含典型案例剖析).docx VIP
- HY_T 0366-2023 海洋数据分类分级标准.docx VIP
- 泵站施工管理工作报告.doc VIP
- ai办公软件培训课件.ppt VIP
- 浙江省杭州市萧山区2024-2025学年八年级上学期期末考试英语试卷(含答案,无听力音频及原文).docx VIP
- 《卵巢囊肿医学》课件.ppt VIP
- 城市建筑群基于弹塑性时程分析的震害评估标准.docx VIP
- 【教学创新大赛】《运动解剖学》教学创新成果报告.pdf VIP
原创力文档


文档评论(0)