- 1、本文档共49页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
ConnectionEngineeringStudyReport-AlbertaElectricSystemOperator.doc
Connection Engineering Study Report for AUC Application
Project Title
File No. XXX
Revision: 0
Revision Date: 2012-03-21
Name Date Signature Prepared by: Engineer, P. Eng. Reviewed by: Engineer, P. Eng. Approved by: Engineer, P. Eng. Executive Summary
(Note: The Executive Summary is a high-level summary of the report. Be brief. Make sure the information in the Executive Summary and the information in the Summary and Conclusion are consistent.)
Project Overview
Organization proposing the project
Project content
Project location
Project purpose
In-Service date
Existing System
Overview of existing system
Relevant constraints
Study Summary
Reasons for study
Study scope
Study area definition
Studies carried out (system conditions, such as summer peak considering Category A and Category B conditions)
Alternative Selected
Reasons for selection
Post connection constraint(s) and constraint management (if any)
Recommendation
Action recommended
Contents
Executive Summary 1
1. Introduction 5
1.1. Project 5
1.1.1. Project Overview 5
1.1.2. Load Component 5
1.1.3. Generation Component 5
1.2. Study Scope 6
1.2.1. Study Objectives 6
1.2.2. Study Area 6
1.2.3. Studies Performed 7
1.3. Report Overview 7
2. Criteria, System Data, and Study Assumptions 8
2.1. Criteria, Standards, and Requirements 8
2.1.1. AESO Transmission Reliability Criteria 8
2.1.2. AESO Operating Policies and Procedures (OPPs) and Authoritative Documents (ADs) 8
2.1.3. Other Requirements (Use a heading for each) 8
2.2. Load and Generation Assumptions 8
2.2.1. Load Assumptions 8
2.2.2. Generation Assumptions 9
2.2.3. Intertie Flow Assumptions 9
2.3. System Projects 10
2.4. Customer Connection Projects 10
2.5. Facility Ratings and Shunt Elements 10
2.6. Dynamic Data and Assumptions 11
2.7. Protection Fault Clearing Times 13
2.8. Voltage Profile Assumptions 13
3. Study Methodology 14
3.1. Study Objectives 14
3.2. Study Scenarios 14
3.3. Connection Studies Carried Out 15
3.4. Power Flow Analysis 15