网站大量收购独家精品文档,联系QQ:2885784924

GuidanceNotefortheMonitoringReportTemplate.doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
GuidanceNotefortheMonitoringReportTemplate.doc

Guidance Note for the Monitoring Report Template This guidance note is to be read in conjunction with the new template for the Monitoring Report, which has been adopted in the Joint Monitoring Committee meeting on 15.12.2005. For each project covered by this monitoring report, you should provide the information requested below. The information provided for each project should not exceed ten pages (12 font). The information should be provided in the order given here. The information provided for the items 4, 5, 6 and 7 should relate directly to the period covered by this report (as specified on the front cover) – information relating to the other monitoring periods should not be included in this monitoring report. Monitoring Report No: M/CC/SSS/ PRO/YY-N M Monitoring Report CC Country Code SSS Sector Code (code for the Sectoral Monitoring Sub-Committee) PRO Project Number in the project fiche (last 6 digits) YY Year N Progressive report number for current monitoring year Example: An environment project, which was programmed in 2001 with a project number 0101.01 has an monitoring report number as: M/TR/INF/0101.03/06-1 This is the first monitoring report number of the environment project (project number of TR0101.03) for the year 2006. For the second report of this project in 2006 last number will be 2. M/TR/INF/0101.03/07-1 For the first report of 2007, the report number Country: Country name Sector: Sector name Programmes covered: Name of the project or programmes Author: Beneficiary Institutions and name of the specific department that presents the monitoring report Date: Starting date and Cut-off date of the Monitoring Report. Starting date is the last date of the previous report and if that is the first monitoring report concerning that project then the signature of the Financing Memorandum is the start date of the monitoring report. Obviously, final date of the report is the cut-off date of the monitoring report. Example: If

文档评论(0)

ailuojue + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档