星河苑小区2号楼工程设计方案说明书毕业设计
设计总说明
从本世纪初开始,我国建筑行业特别是房地产行业得到了突飞猛进的发展。但是由于2011年国家逐渐对房地产的限购等政策,使房地产的发展遇到了瓶颈,同时也影响到施工企业的生存和发展。在这种情况下,施工企业需要加强对工程进度和资源调配的控制,便于施工单位加强对工程进行过程中的资金控制,提高资源有效合理的利用,有效的保证工程质量,以实现项目集成化管理、提高项目管理效率,达到节约成本的目的。
本设计。施工方案、方法,General Instruction of Design
From the beginning of this century China construction industry, particularly in the real estate industry has been the development of make a spurt of progress. But because in 2011 the country gradually to the real estate purchase policy, the real estate development has encountered a bottleneck, but also affect the survival and development of construction enterprises. In this case, the construction enterprise needs to strengthen the project schedule and resource allocation control, convenient construction units to strengthen engineering process control of funds, improving resource reasonable use, ensure project quality, in order to achieve the project integration management, improve the efficiency of management of the project, to achieve the purpose of saving the cost.
The design for the project management software in the Starship District Court in 2# application. Galaxy Garden community2# building consists of 18layers, wherein the basement layer, the layer is 3.54 meters tall, the reinforcing positions to the ground floor, ground floor, two layer. Building seismic grade four, design life of 50 years, the structure form of the shear wall structure, the height of 52.2 meters, the foundation raft foundation, no civil air defense construction, other descriptions in this omitted, such as the need for detailed construction drawings of architectural design specification.
The design includes two parts, one part is calculated, including the engineering quantity calculation, reinforced the list of ingredients, integrated unit price analysis table, valuation of project volume detailed list file; another part is the text part, namely the design specifications, including the engineering price analysis, the project schedule, cost planning, resour