This isa technical problem about welding knowledge.docVIP

  • 3
  • 0
  • 约7.72千字
  • 约 5页
  • 2017-05-13 发布于贵州
  • 举报

This isa technical problem about welding knowledge.doc

This isa technical problem about welding knowledge

This is a technical problem about welding knowledge, co2 gas shielded welding is more sensitive to the wind, the wind will affect the welding quality So the specification stated in open-air homework which carbon dioxide gas shielded arc welding shall be adopted. So the supervision engineer shall be stopped. 2. The installation company to owner volume of more than 100 tons of steel structure fabrication and installation the signature of the claim is reasonable? Briefly describes the reasons. From the terms of the contract analysis, installation company to additional quantity of construction steel structure fabrication and installation of claim by the owner is not reasonable. The reason is: A package die expressly stipulated in the contract price, means that the site does not exist to sign additional questions; Produces is the direct cause of installation company when the contract is signed, not carefully analyzing contract, not the quantity of construction drawing Verification, and thus produce the quantities is less this loophole to the installation company their own responsibility. 3. Briefly describes the two occurrences of reason and responsibility. How should handle? Event 2 from responsibility analysis on both sides of the subcontract, A more construction subcontractors construction scope of work content does not belong to you, The main reason is: installation company, the contract has been made to the new construction management personnel clarificaiton, construction and the subcontractors Part of his scope of work is not clear. Both sides have a responsibility. Processing method: Installation to the company and the owner and industrial water supply and drainage and air compressor station of contractor, subcontractors shall have A part of the construction As installation company project scope, and the other sign supplementary agreement; And then install the company with A branch unit, also signed the same content of supplementary agreement , the

文档评论(0)

1亿VIP精品文档

相关文档