- 1、本文档共3页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
报社新闻记者实习报告
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
- 报社员工试用期转正总结.doc
- 报社实习总结及心得体会.doc
- 报社实习总结报告范文1000字.doc
- 报社实习总结报告范文参考.doc
- 报社实习报告心得体会.doc
- 报社实习报告总结3000字.doc
- 报社实习报告精选范文.doc
- 报社实习报告自我鉴定.doc
- 报社实习报告范文1000字.doc
- 报社实习报告范文1500字.doc
- 2025年公园健身器材能耗监测与节能技术集成应用研究报告.docx
- 高中生课外阅读能力提升与自主学习习惯培养的实践研究教学研究课题报告.docx
- 《视障儿童触觉感知训练的跨地域效果对比研究》教学研究课题报告.docx
- 基于核心素养的高中生物教学中的生物进化论教学策略与实践教学研究课题报告.docx
- 2025年乡村非遗文化跨境研学旅行项目旅游市场拓展与品牌建设策略.docx
- 小学数学课堂中校园垃圾分类数学问题解决案例研究案例分析研究教学研究课题报告.docx
- 《手术室护理快速康复外科理念对慢性病患者术后康复的影响研究》教学研究课题报告.docx
- 高中校园交通标识设置与交通事故预防策略研究教学研究课题报告.docx
- 2025年公园健身设备智能互联改造技术路径与实施难点分析.docx
- 2 《地域文化在城市公共艺术景观设计中的民俗文化融合策略》教学研究课题报告.docx
最近下载
- 检测单位各部门岗位职能职责.doc VIP
- 2025内蒙古鄂尔多斯市公安机关招聘留置看护警务辅助人员115人笔试参考题库附答案解析.docx VIP
- 模电教案-李国丽.doc
- 2023版中国结直肠癌及癌前病变内镜诊治共识PPT课件.pptx VIP
- 证监会现场核查工作底稿-A股首次公开发行IPO保荐底稿.docx VIP
- UIC513-1994铁路车辆乘坐舒适性评估.pdf VIP
- 2025年医学课件-右心声学造影.pptx VIP
- 企业内部控制培训课件完整版(164页PPT).ppt VIP
- 2024年秋人教版七年级英语上册全册课件:Unit 7.pptx VIP
- Unit 6 A day in the life Section B (课件)-2024-2025学年人教版英语七年级上册.pptx VIP
文档评论(0)