- 1、本文档共2页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
测量实训心得
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
- 泰康人寿保险公司实习报告范文.doc
- 洗发露广告词.doc
- 洗浴管理个人工作总结600字.doc
- 洗浴管理年度工作总结800字.doc
- 洛阳土地承包合同范本.doc
- 活动即兴演讲稿格式.doc
- 活动即兴演讲稿范文.doc
- 活动场地租赁合同.doc
- 活动开幕式主持词.doc
- 活动总结范文 村委会2012年爱国卫生活动月工作总结.doc
- 第3课《首届诺贝尔奖颁发》课件统编版语文八年级上册.pptx
- 中外历史纲要下册73个重点问题整理+课件--2026届高三历史统编版必修中外历史纲要下册一轮复习.pptx
- 第8课时+辽宋夏金元的统治+课件--2026届高三统编版(2019)必修中外历史纲要上一轮复习.pptx
- 高三地理复习课件3.4海水的性质.pptx
- 8.2+法治政府+课件-2026届高考政治复习统编版必修三政治与法治.pptx
- 第12课《短文二篇》课件统编版八年级语文上册.pptx
- 第8讲+中华古代文明的转型——明至清中叶社会转型与社会停滞+课件--2026届高三统编版(2019)必修中外历史纲要上一轮复习.pptx
- 给高考生的历史学习指南+课件--2026届高三历史统编版一轮复习.pptx
- 第8讲+两宋的政治和军事 高三统编版(2019)必修中外历史纲要上一轮复习.pptx
- 高考地理一轮复习学案—专题一地球与地图第01讲地球仪与地图三要素.pptx
最近下载
- 存储网络配置指导华为oceanstor sns2124 2224 2248 3096 5192 5384产品概述.pdf VIP
- YB∕T 4001.3-2020- 钢格栅板及配套件 第3部分:钢格板楼梯踏板.pdf VIP
- 中国钢结构制造企业资质管理规定(暂行).pdf
- VTE的治疗与预防.pptx VIP
- (公共英语等级考试三级大纲词汇4107个记忆情况.doc VIP
- [医疗机构设置审批有关规定.doc VIP
- 建设工程档案管理课件.ppt VIP
- DD 2019-02 固体矿产地质调查技术要求(1:50000).pdf VIP
- xx太阳能发电公司50MWp光伏电站项目安全设施设计专篇.pdf VIP
- 物业管理单位服务费用测算明细表.pdf VIP
文档评论(0)