- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中国石油大学胜利学院毕业设计(论文)
外文翻译
大中型穿越河流输油管道的风险评估
学生姓名:曾媛
学 号:201110015230
专业班级:油气储运工程二班
指导教师:张国栋
2015年6月10日
Abstract
Risk assessment technology in foreign countries officially started in the seventies of the last century, in our country started in the mid nineties of the last century, the technology is within a certain period of safety, health, ecological, financial and other aspects by the possibility of damage and by the extent of the damage to make assessment of the system process, now has been used in many areas, many disciplines, in oil and gas pipeline application is very extensive.
The risk factors that affect the safe operation of the pipeline through the river transportation pipeline are analyzed, and the risk types of the pipeline safety operation are classified by referring to the relevant literature of the pipelines crossing the rivers and pipelines.According to the oil gas pipeline risk assessment theory, the risk of long-distance oil pipeline is four kinds of factors, such as corrosion, damage, design error, personnel error, etc..?For pipeline crossing, because by vortex induced vibration, flood impact external loads, in addition to the above four factors, should also supplement fatigue damage and instability, the strength destroying two kinds of factors, and on this basis, established through the pipeline risk assessment risk of fault tree.Will in the world at present commonly used methods of risk assessment index score method is applied to through the pipeline risk assessment, calculated through the pipeline social relative risk and the management of the number relative risk number, give the general steps of the pipeline risk assessment index score, for decision makers are risk management of pipeline system provide complementary and quantitative indicators, to realize the transition from safety management to risk management.The validity of the risk assessment of a pipeline through a pipeline is demon
您可能关注的文档
最近下载
- 2023年国家统一法律职业资格考试客观卷一真题与解析.docx VIP
- 电动单梁起重机自检报告_2.doc VIP
- 病理科工作程序规范化及质量控制细则.docx VIP
- 专题16 原子物理【好题汇编】2024年高考真题和模拟题物理分类汇编含解析.docx VIP
- 病理科工作质量要求和质量控制标准(100分).pdf VIP
- 神经源性肠道功能障碍PPT课件.pptx
- DB32/T 4539-2023 淡水生物环境DNA监测技术方法.docx
- 小学各年级, 尊重与包容,主题班会.pptx VIP
- 5.3实际问题与一元一次方程(行程问题)同步练习2025-2026学年人教版七年级数学上册.docx VIP
- 设备厂家授权委托书 .pdf VIP
原创力文档


文档评论(0)