- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Few Railroads On Track To Meet EndEnd-Of-Year Safety Deadline 只有少数铁路安全年间达标
Few Railroads On Track To Meet End-Of-Year Safety Deadline
The Southeastern Pennsylvania Transportation Authority tests its Positive Train Control system at the agencys rail yard near Malvern, Pa. The system will cost SEPTA about $328 million. The regional passenger railroad is one of the few in the country that are on track to meet an end-of-the-year deadline for installing PTC. Jeff Brady/NPR
Railroads warn they may have to shut down unless Congress extends an end-of-the-year deadline to install new safety equipment called?Positive Train Control.
PTC is a complex system that monitors a trains location and speed, then automatically slows down or stops a locomotive if the engineer doesnt respond to a danger warning.
Congress required passenger and freight railroads to install PTC in 2008, after?a Metrolink passenger train collided with a freight train in Los Angeles, killing 25 people. It also would have?slowed down the fast-moving Amtrak train?that derailed earlier this year in Philadelphia, killing eight.
The?2008 Rail Safety Improvement Act?set a deadline of Dec. 31, 2015, for railroads to implement PTC systems — or face big fines. Metrolink is among the few railroads expected to meet the deadline, according to a?Government Accountability Office report. Other passenger railroads on track to finish by the end of the year include Caltrain, Southeastern Pennsylvania Transportation Authority, known as SEPTA, and TriMet in Oregon.
SEPTA locomotive engineer Steve Finnegan remains in control of a train using PTC. But if SEPTA reduces speed on a certain set of track or sends an order for the train to stop and he fails to comply, PTC will do it automatically.
Jeff Brady/NPR
Amtrak expects to have PTC installed by the deadline along the Northeast Corridor — between Washington, D.C., and Boston — and on its line between New York and Harrisburg, Pa.
The mandate is most expensive for freight railroads, which have tens of thousands of miles of track to include in their PTC sys
您可能关注的文档
最近下载
- 境内医疗器械变更注册申报资料电子目录(参考) .pdf VIP
- 结核分枝杆菌合并乙型肝炎病毒感染诊治专家共识.pptx
- 中纤板电器基础详解.ppt VIP
- 社交礼仪——饮茶礼仪(课件-PPT).pptx VIP
- 基础护理学说课-姜丽.ppt VIP
- 河南诗词大赛题库及答案2024.doc VIP
- 2024年新版全员消防安全知识培训【附最新案例】(77页).pptx VIP
- NB/T 35054-2015_水电工程过鱼设施设计规范.pdf
- (完整版)无菌医疗器械耗材生产企业体系文件 质量手册模板.pdf VIP
- 2025-2026学年小学信息技术(信息科技)三年级上册湘科版(2024)教学设计合集.docx
原创力文档


文档评论(0)