Tower Crane.pptVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Tower Crane

By John Liedig Jouline Nour Introduction Tower cranes are a common fixture at any major construction site. They often rise hundreds of feet into the air, and can reach out just as far. Tower cranes are used to lift steel, concrete, large tools like acetylene torches and generators, and a wide variety of other building materials. Arm and Tower Sections Dimensions The tower crane is approximately 120m tall 10m wide The counter weighted arm is 60m long And the main jib can be as long as 90m Modelled Tower Crane Looked at 2 scenarios 2d 3d The aim was to determine the differences in both 2D and 3D cases in relation to displacement and stress analysis Objectives To use Strand 7 on a complicated structure such as a tower crane Model the tower crane to the dimensions given from relevant data Determine stresses and displacements associated from various locations of loads on the structure Try and improve the structure Objectives To see if there was a better way of modelling the tower crane on Strand 7 Through using different materials Modifying the shape Method Determined the dimensions of the tower crane using data from the internet and other relevant crane construction guides Determined various components involved in the tower crane Identified the materials for each of the various components and then selected these from the strand 7 library Method Drew a 2D representation of the tower then the arm and then used strand 7 commands to convert into a 3D structure Entered various loading scenarios Ran analysis Modified the elements accordingly to meet acceptable limits in the results. Materials The materials used were predominantly structural steel of various sizes The cable also is made from steel with a free length ranging from 50 to 80m All sections are circular hollow sections Load Cases Taken a variety of load cases Loads were placed at individual nodes along the arm of the tower crane In the final report the natural frequency is also going to be considered but h

文档评论(0)

ay8088 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档