Pipe purging before protection
Pipe purging before protection, pipe should be within the instrument, orifice, nozzle, filter, install the orifice, throttle valve, regulating valve, solenoid valve, safety valve, check valve, pipe component such as a temporary demolition to simulate a body or temporary short tube replacement, for welding in the form of the valves and instrumentation, flowing through the bypass should be taken or protection measures such as removing the valve head and valve seat and cases.
5. The purge order: the order of the purge should according to the director, branch pipe, water pipe.
6. Environmental requirements: clean emissions of dirty liquid shall not pollute the environment, it is strictly prohibited to anywhere. Purge out the dirt, shall not have passed into the pipeline. After qualified pipeline purging and reset, shall not be affected tube cleaning other assignments.
7. Security requirements: purging should be set when the security area, purging mouth it is forbidden to stand. Steam purge, piping and shall not be placed near combustible materials.
8. Reset when the pipelines, should be jointly by construction units and construction units to check, and should be stipulated in the specification of the format to fill in scavenging pipeline system and cleaning records and take cover engineering (closed) records.
(2) water flushing implementation
1. The water quality requirement: water rinse clean water should be used. Rinse stainless steel tube, nickel and nickel alloy steel pipe, content of chloride ion in water shall not be more than 25 PPM.
2. The velocity required: water flushing flow rate shall be not less than 1.5 meters per second, flushing pressure shall not exceed the pipeline pressure.
3. Wash the exhaust pipe cross-sectional area should not be less than 60% of wash pipe cross-sectional area, can not form a negative pressure drainage.
4. Continuous to wash, to discharge water and transparency is consistent with the inlet water visual for qualified. When
您可能关注的文档
- 倍数的表达.doc
- 随身听手册-274.doc
- 有关煤炭.doc
- 煤洁净技术简介.doc
- 初一至初三 地点名词.doc
- 06 四级试卷翻译题.doc
- M10U1翻译句子.doc
- 国家机关名称(英文).doc
- 兖州煤矿解说词.doc
- Our country.doc
- precast processing.doc
- 雅思语汇试题多种方式记单词第3期.doc
- 节前安全提醒.doc
- 船厂和船舶修理需要使用的密封件Microsoft Word 文档.doc
- 高一上册5-6单元单词用法.doc
- CAP 123I BUILDING (STANDARDS OF SANITARY FITMENTS, PLUMBING, DRAINAGE WORKS AND LATRINES) REGULATION.doc
- 《英语听力教程2》文本3.doc
- Traffic detection instrument installation.doc
- 机械设备缩写代号.doc
- 爆破工12月考试卷.doc
原创力文档

文档评论(0)