- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
14-Ruston TB5400
What is TB5400 Gas Turbine Ruston gas turbine is twin shaft unit and comprise two main section: 1. The gas generator, 2. Power turbine 1.The gas generator: a). The air inlet casing; b). Compressor stator casing; c). Compressor rotor; d). Compressor turbine stator casing; e). Compressor turbine rotor; f). Center casing; g). Combustion chamber. 2. Power turbine: a). The power turbine stator assembly; b). Exhaust collector assembly; c). Power turbine rotor; d). Driven reduction gearbox. Ruston TB5400 Gas generator( gas turbine) Air inlet casing: a). Air inlet ducting; b). Variable inlet guide vanes(26ea vanes): It is operated by an relay valve in which P2(52psi) comes from stage 10 of compressor to drive the air relay valve, while engine reaches approximately one third of full load(1250KW), the IGV will be automatically pushed to running position, therefore giving maximum mass air flow to gas generator and resulting in a reduced maximum temperature at max. load. Compressor Rotor and stator 1. Compressor rotor equips twelve stages of stator blades and one stage of inlet guide vanes. 2. To prevent compressor surge during starting and to limit the degree of over speed when load is shed, it is necessary to reduce the compressor delivery pressure, so compressor stator fitted two blow off valves with spring loaded and located between stator stages six seven, four blow off valves are fitted on the rear of centre casing, but without spring equipped. CT and PT rotor stator 1.CT and PT rotor consists of two stages and stator has two stages as well. 2.CT and gas generator has the same speed, 100% full speed is 10,000rpm, Max is 105 and overspeed set point is 110%+3%. but PT speed is lower than CT speed, full speed is 7950rpm, overspeed set point is the same as above. 3.There are 16 thermocouples fitted on the exhaust of PT, even number of thermocouple feeds signal to governor, but odd number of thermocouple feed signal to temperature monitor. In additional, 2 extra ther
您可能关注的文档
最近下载
- 体例格式12:任务2教学单元2工学一体化课程《windows服务器基础配置与局域网组建》之教学单元活动方案.docx VIP
- 反恐安全意识培训程序.doc VIP
- 消毒供应室带教老师课件.pptx
- 2019推荐智慧仓储研究报告-智能物流专题Ⅲ:消费物流(上)去繁从简,智能先行(3PL,零售篇).pdf VIP
- 测量人员安全操作规程.docx VIP
- 接待工作培训资料.pdf VIP
- 幼儿园大班5以内的加法.ppt VIP
- 中小学校膳食经费管理专项督查表.docx VIP
- 体例格式12:任务2教学单元3工学一体化课程《windows服务器基础配置与局域网组建》之教学单元活动方案.docx VIP
- 2025至2030中国限滑差速器(LSD)行业项目调研及市场前景预测评估报告.docx
文档评论(0)