石材干挂工程施工方案.docxVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
石材干挂工程施工方案

商丘建业十八城三期石材干挂工程施工方案编制:审核:审批;河南永畅建工集团有限公司二O一六年五月九日目录一、工程概况···································································21.l工程概况·······························································21.2.编制依据·····························································2二、施工总体安排·······························································22.l计划投入本工程嚣主要施工机械、设备······························22.2计划投入本工程的人员···············································2 2.3计划投入本工程的材料················································3 2.4施工前期准备工作·····················································4三、施工进度计划·······························································4四、主要施工方法·······························································4 4.1脚手架的搭救设、使用及拆除施工工艺······························4 4.2石材干挂安装上艺流程················································6 4.3施工要求·······························································6质量保证措施······························································8应注意的质量问题························································10成品保护··································································11清理方案··································································11安全保证措施·····························································12工程概况 1.1工程概况 河南省商市建业十八城三期项目,本工程为新建工程,外墙为干挂石材墙两,外挂石材面积约4000 m2左右。1.2编制依据 《建筑施工扣份斌钢管脚手架安全技术规范》(JGJ130-2002) 《金属与石材工程技术规范》(JGJ133-2001) 《硅酮建筑密封胶》 (GB/T14683-93)二、施工总体安排 2.1计划投入本工程的主要施工机械、设备序号 机械或设备名称数量 国别产地1台钻 3国产2切割机 3国产3 冲击钻6国产4胶枪3把5315电焊机3台6拖线电闸箱2台7手推车4台8水准仪1国产9大切1台2.2计划投入本工程的人员 1)人力资源使用计划根据该工程的工期要求和工作量,提前落实人力资源的来源,做好人力资源的统筹安排,成立强有力的架子队伍,担负施工任务,做到既保证人力资源充足又不窝工。(1)、人力资源专业工种配备:工程施工高峰期计划投入总人力资源:33人,平均入力资源:5人。人力资源专业工种配备表序号 劳动力资源、工种配置人数备注1架子工32石材安装工及打胶工203龙骨安装工84测量员15杂工1合计33 2.3计划投入本工程的材料 1)钢管:普通钢管,外径尺寸48 mm,壁厚3.5mm,钢管外表面锈蚀深度0.5mm,钢管弯曲符合规范要求.2)骨架:钢材选用要符合现行国家标准的规定。所有龙骨的钢材应其有质量证明书或检测报告,并应符合设计要求。若钢材表露有锈蚀、马甸或划痕等缺陷,其深度不得大于该钢材厚度负偏差值的l/2。主龙骨采用6#槽钢,横龙骨采用5#角钢,主龙骨与横龙骨主要受力构件截面主要受力部分厚度不小于3.3mm。 3)膨胀螺丝:应根据荷载大小确定,一般为M1O,

文档评论(0)

bigone123 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档