the step.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
the step

the step-down start. In less energy consumption in the process of start, start a smooth, but need to be equipped with a dedicated power supply equipment, so the most frequently under the condition of medium and large for the dc motor. (6) inverter installation requirements 1. The frequency converter should be installed vertically, four weeks leave ventilated space. 2. Install the inverter of the base plate must be made of heat resistant material. 3. The adoption of forced air cooling frequency converter into the tuyere air filter should be set up. More than 4. The frequency converter in parallel arrangement, must leave enough space between Taiwan and Taiwan, generally should not be less than 50 cm. 5. The inverter cannot be installed in the combustible gases, explosive dangerous sites. 6. Frequency converter should be properly grounded, in order to improve the control sensitivity, noise, guarantee personal safety. (7) soft start device installation requirements 1. The soft starter shall be installed indoors. 2. Soft start device should be installed vertically, below should be standing on its more than 200 mm of space, good for heat dissipation. 3. After the soft starter input terminal connected to the power supply, when open load or open phase, can have very high induction voltage output, so it is strictly prohibited in the installation and debugging, maintenance and use of contact with the output end of the soft starter, lest cause accident getting an electric shock. Pick up by 4. In order to improve the power factor compensation capacitor must be put in the soft starter of the input. 5. Measure the insulation resistance motor, it must be three connections between soft starter and unlock the can. (eight) PLC installation requirements 1. To facilitate ventilation and tear open outfit, PLC should be left more than 80 mm of space around. 2. PLC should be installed vertically, not horizontal installation. 3. The installation of PLC should be far away from strong electr

文档评论(0)

80019pp + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档