尼日利亚科吉州依托巴火电站项目

尼日利亚科吉州依托巴火电站项目 项目概况 尼日利亚科吉州依托巴火电站项目业主为Zuma Energy Nigeria Limited。火电站包括8台机组,单机容量为150MW,总装机容量1200MW,分二期开发,计划开工后第36月第一台机组发电。项目采用EPC总承包模式实施,承包人负责火电站勘察设计、设备采购、施工安装及调试等工作。目前我公司已与保利科技组成联营体参与该项目。主要包括以下工作内容: 1. The Power Plant: It will include delivery and erection of turbines,boilers, balance of plants and auxiliaries, etc. in addition to civil works,erection of control room, testing and commissioning. 2. Power Evacuation: A double circuit 330 kV transmission line will be constructed to connect the power plant to the National Grid at Ajaokuta-Lokoja-Gwagwalada 330 kV DC line, a distance of 25 km to the tie-in point. 3. Roads Upgrade for coal transport from mine site to power plant location: Owing to the very large quantity of coal that will need to be transported over a distance of between 85km – 90km from the coal mine at Okobo to the power plant at Itobe, it is proposed that road upgrades be made to enable the use of 60 Ton trucks. Zuma Energy to obtain all necessary permits from the relevant authorities and right of way if any. 4. Roads Upgrade for limestone transport from quarry to Power plant site: Limestone will need to be transported via trucks a distance of about 150km from the quarry site at Ekerin-Adde to the power plant location at Itobe. Zuma Energy to obtain all necessary permits from the relevant authorities and right of way if any. 5. Fuel Transportation and Storage: Fuel storage/ tank farm will need to be built for diesel storage. 6. Jetty Construction: A multipurpose Jetty will be constructed for delivery of equipment, coal and other fuels and goods to site. 7 Residential area for construction workers and power plant personnel: During construction, about 400 workers will be on site in peak periods. The estate will house construction workers and later serve as residence for power plant operators and administrative staff. 8 Relocation of Local Community: It is necessary to relocate a number of local residents at the Ite village close to the proposed pow

文档评论(0)

pt540099 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档