尼日利亚科吉州依托巴火电站项目
尼日利亚科吉州依托巴火电站项目
项目概况
尼日利亚科吉州依托巴火电站项目业主为Zuma Energy Nigeria Limited。火电站包括8台机组,单机容量为150MW,总装机容量1200MW,分二期开发,计划开工后第36月第一台机组发电。项目采用EPC总承包模式实施,承包人负责火电站勘察设计、设备采购、施工安装及调试等工作。目前我公司已与保利科技组成联营体参与该项目。主要包括以下工作内容:
1. The Power Plant: It will include delivery and erection of turbines,boilers, balance of plants and auxiliaries, etc. in addition to civil works,erection of control room, testing and commissioning.
2. Power Evacuation: A double circuit 330 kV transmission line will be
constructed to connect the power plant to the National Grid at
Ajaokuta-Lokoja-Gwagwalada 330 kV DC line, a distance of 25 km to
the tie-in point.
3. Roads Upgrade for coal transport from mine site to power plant
location: Owing to the very large quantity of coal that will need to be
transported over a distance of between 85km – 90km from the coal
mine at Okobo to the power plant at Itobe, it is proposed that road
upgrades be made to enable the use of 60 Ton trucks. Zuma Energy
to obtain all necessary permits from the relevant authorities and right
of way if any.
4. Roads Upgrade for limestone transport from quarry to Power
plant site: Limestone will need to be transported via trucks a distance
of about 150km from the quarry site at Ekerin-Adde to the power plant
location at Itobe. Zuma Energy to obtain all necessary permits from
the relevant authorities and right of way if any.
5. Fuel Transportation and Storage: Fuel storage/ tank farm will need
to be built for diesel storage.
6. Jetty Construction: A multipurpose Jetty will be constructed for
delivery of equipment, coal and other fuels and goods to site.
7 Residential area for construction workers and power plant
personnel: During construction, about 400 workers will be on site in
peak periods. The estate will house construction workers and later
serve as residence for power plant operators and administrative staff.
8 Relocation of Local Community: It is necessary to relocate a
number of local residents at the Ite village close to the proposed
pow
您可能关注的文档
- 实验二 网络配置.doc
- 实验二+基本数据类型、数组.doc
- 实验仪器英文.doc
- 实验五认识特技切换台.doc
- 实验参考程序.doc
- 实验四、五、六.doc
- 实验报告4 期末作业.doc
- 家庭太阳能供电系统.doc
- 容量计重登轮英语对话.doc
- 寄存器的物理地址的概述.doc
- 重庆新速达物业服务集团股份凯里公司招聘笔试题库2024.pdf
- 浙江杭州千岛湖泰众肉类食品有限公司招聘笔试题库2024.pdf
- 陕西新华出版传媒集团新华书店分公司招聘笔试题库2024.pdf
- 宁夏海原县肉牛产业发展集团有限公司招聘笔试题库2024.pdf
- 浙江温岭市化工轻工建筑材料有限公司招聘笔试题库2024.pdf
- 中航飞机汉中航空零组件制造有限公司招聘笔试题库2024.pdf
- 山东海阳市海昇矿产资源开发有限公司招聘笔试题库2024.pdf
- 山东潍坊寿光市公共交通运输有限公司招聘笔试题库2024.pdf
- 内蒙古察右前旗农业投资开发有限公司招聘笔试题库2024.pdf
- 线上清明祭英烈活动策划.pptx
文档评论(0)