- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
耦合器介绍
1.3GHz Input Coupler for ILC IHEP RF Outline Design The major results of simulation calculation (review) The mechanical design Fabrication Have been done To be done Background By investigating and considering our fabrication experiences, we choose the STF baseline type coupler as ILC 1.3GHz coupler design prototype. That is to say, the coupler have two plate windows with choke structure, one is in low temperature and another is in normal temperature . In phase I, we aim to design and fabricate a fixed coupling coupler; and in phase II, a variable coupling coupler will be designed. Coupler Specification RF Structure of Coupler Two coaxial type windows; Cold coaxial: 50 Ohms, 60mm diameter; Warm coaxial: 50 Ohms, 81mm diameter; Flexibility: 4 bellows in the warm coaxial; Doorknob: WR650 waveguide - 104mm coaxial transition; Ceramics: Al2O3 with TiN coating on vacuum side; Copper plating on stainless steel coaxial. Mechanical Design Base on the RF design, cryostat design and experience, we make the mechanical design. Engineering Drawing – Details Fabrication Progress Manufacturer: IHEP Experiment Factory. The fabrication started in June 2010. The work finished: Parts machining; Ceramic cold-shock test; Copper plating brazing test; The work is being done: Parts cleaning; TIG welding; Copper plating; TiN coating; Brazing; Parts Machining – Doorknob Finish machining; Waiting for cleaning, TIG welding and brazing. Ceramic Cold Shock Testing The cold window works under 80K temperature, it is need to do cold shock test; Test 99.5% and 97% alumina disk, 2 pieces for each; The test procedure: Cover the ceramic disks by Aluminium foil; Put them in liquid Nitrogen; After cooled down, take them out to room temperature; Repeat for 3 times. Uncover and watch it, make sure there is no crack. No crack was noticed on all ceramic disks. Bellow Plating And Brazing Test We are poorly experienced in copper plating on bellow, so the plating and brazing test was necessary. The Works
您可能关注的文档
- 美丽的英语文章.doc
- 美国亚马逊购物 (超详细) 海淘攻略.pptx
- 美国旅游景点.doc
- 美国生物学文摘.ppt
- 美国节日-独立日英文简介.pptx
- 美服激战2梦魇深处成就获得详细图文攻略.doc
- 翻译SQL文献.docx
- 翻译备课.doc
- 翻译练习..ppt
- 耀祥中学2008年下期高一英语期中考试试题.doc
- 2024浙江衢州市常山县“英才荟”事业单位紧缺急需人才招聘18人笔试备考试题及答案解析.docx
- 2024浙江省近海海洋工程环境与生态安全重点实验室招聘1人笔试备考试题及答案解析.docx
- 2024广东阳江市阳西县补充招聘森林消防应急队员5人笔试备考试题及答案解析.docx
- 2024浙江松阳县新华书店有限公司招聘见习大学生1人笔试备考试题及答案解析.docx
- 2024云南曲靖市马龙区部分事业单位选调(含选调计划)26人笔试备考试题及答案解析.docx
- 2024广西柳州市残疾人劳动就业服务中心招聘残疾人专职委员1人笔试备考试题及答案解析.docx
- 2024广西河池市总工会公开招聘社会化工会工作者3人笔试备考试题及答案解析.docx
- 2024贵州华贵人寿保险股份有限公司第三次社会招聘15人笔试备考试题及答案解析.docx
- 2024广西百色市田东县5月城镇公益性岗位工作人员招聘4人笔试备考试题及答案解析.docx
- 2024广西百色市那坡县坡荷乡人民政府公开招聘编外工作人员2人笔试备考试题及答案解析.docx
文档评论(0)