- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
inspection procedure for electric 电气检查程序
Part one:Heavy current
1. Inspection process for laying out covered conduit of galvanized steel pipe
2. Inspection process for laying out the conduits of exposed conduit,suspended ceiling and clap board.
3. Inspection process for installing the insulated conductor in conduits
4. Inspection process for installing lamps and ceiling fan
5. Inspection process for installing wiring of slot cable tray
6. Inspection process for installing the switch socket
7. Inspection process for installing distribution box
8. Inspection process for installing earthing and lightning
Part2:Light current system.
9. Inspection process for safety and protection system.
10. Inspection process for visual conversational system
11. Inspection process for access control system
12. Inspection process for monitoring system
13. Inspection process for E-inspection system
14. Inspection process for perimeter protection automatic alarm system
15. Inspection process for background music/ broadcasting system
调
16. Inspection process for BBS
17. Inspection process for PDS
18. Inspection process for building automation system
19. Inspection process for fire fighting system
Part3:Electrical installation
20. Installation inspection for transformer
21. Installation of the box type substation
22. Installation of whole set of distribution box,control cabinet and lighting distribution box
23. The secondary line and guide line of distribution box
24. Wiring inspection for low tension motor and electrical operator
25. Installation inspection for diesel-electric set
26. Installation inspection for UPS
27. Test and working procedure for low voltage equipment
28. Close and install the plug board bus
文档评论(0)