- 5
- 0
- 约2.5万字
- 约 31页
- 2016-08-28 发布于河南
- 举报
北京西门子s7培训资料A1482_f_02
Installation/Maintenance of a PLC Components for the Configuration of an S7-300 Mounting Positions for an S7-300 Configuration Expansion Capabilities for an S7-300 Installation Rules For a horizontal configuration, the CPU and power supply must be arranged on the left. For a vertical configuration, the CPU and power supply must be arranged at the bottom The following minimum clearances must be maintained: 20 mm to the right and left of the rack 40 mm above and below for a single-tier configuration and at least 80 mm between two racks The interface module always occupies the space next to the CPU There may be a maximum of eight I/O modules (signal modules, function modules, communication processors) inserted in a rack A multi-tier configuration is possible only for the CPU 314/315/316 Please ensure that there is a low resistance connection between the rail and the substructure, such as through contact washers. Installation Aids Installation Check List Installing the Rail (Part 1) Installing the Rail (Part 2) Check List for Electrical Configuration 1. Are analog signals or bus signals used? 2. Do cables with 60V exist? 3. Are inductances switched by additional contacts in the output circuit or independent of the programmable logic controller? 4. Will cables be laid outside of buildings? Wiring the Front Connector Open the front door of the signal modules ! Bring the front connector into wiring position ! Thread the strain reliever in the front connector ! Strip the insulation from the wires (6 mm length) ! Connect the wires ! Tighten the strain relief for the cable loom ! Position the front connector in the operating position ! Close the front door ! Fill out the labeling strip and insert it in the front door ! Attach the slot number to the front door ! Preparing for Operation Insert the keyswitch in the CPU ! Install the back-up battery ! if the user program is not stored in a power failure-proof way in the memory module if larger data areas must remain retentive
您可能关注的文档
- 初中英语词汇语法 第十二讲现在完成时.doc
- 初中词汇分词性串讲八上.doc
- 初二上U3,U4单词复习.doc
- 初二期末预测卷 2个课时.doc
- 初二英语第二学期期中考试模拟卷.doc
- 初二英语讲义-新王牌.doc
- 初步学习3D MAX第16讲.ppt
- 初学者使用MySQL_Workbench_创建数据库教程.doc
- 初级建模实例.pptx
- 初音歌曲列表(个人整理)1.2.docx
- 25-26学年政治(部编版)选择性必修第二册课件:第1单元 周清1 民法中的人身权及财产权.pptx
- 25-26学年政治(部编版)选择性必修第二册课件:1.4.1 权利保障 于法有据.pptx
- 2025北京丰台区高二(上)期中地理(A卷)含答案.docx
- 2025北京三帆中学初三(上)开学考英语试题含答案.docx
- 2025北京一零一中初三9月月考语文试题含答案.docx
- 2025北京海淀区初三(上)期中道法试题含答案.docx
- 2025北京丰台区高一(上)期中政治(A卷)含答案.docx
- 25-26学年政治统编版必修4课件:3.3 唯物辩证法的实质与核心.pptx
- 25-26学年政治统编版必修4课件:7.2 正确认识中华传统文化.pptx
- 湖北省部分高中2026届高三上学期二模联考 历史试卷.docx
最近下载
- J B-T 8577-2015 内燃机水散热器技术条件.pdf VIP
- 王明新数学物理方程习题解答.pdf VIP
- 云网融合的多云网络架构.pdf VIP
- 20220301电缆行业SAP解决方案.pptx VIP
- 【精选】0深圳生态规划0深圳生态规划.pdf VIP
- KA_T 22.1-2024 矿山隐蔽致灾因素普查规范 第1部分:总则.docx VIP
- GDBD-2025-12 输变电工程环保水保监测与验收费用计列指导意见.pdf VIP
- 手把手教你做应付票据审计底稿.pdf VIP
- 《商务英语:职场进阶》教师用书 完整版.pdf VIP
- 深度:短期看新车型销量及FSD,中期看能源,长期看Optimus.pdf VIP
原创力文档

文档评论(0)