- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Equipment_Answer.doc
Stack Configuration
1. Using the BOP configuration shown below answer the following questions.
a. With drillpipe in the hole, is it possible to shut the well in under pressure and repair the side outlets on the drilling spool?
A. Yes B. No
b. With no drill pipe in the hole, is it possible to shut the well in under pressure and repair the drilling spool?
A. Yes B. No
c. Is it possible to shut the well in with drill pipe in the hole and circulate through the drill pipe?
A. Yes B. No
d. With drill pipe in the hole, and the well shut in under pressure with the annular preventer, is it possible to circulate through the kill line and choke line?
A. Yes B. No
e. With no drillpipe in the hole, is it possible to shut the well in under pressure using the annular preventer and change pipe rams to blind rams?
A. Yes B. No
f. While replacing the ring gasket on the drilling spool choke line flange the well starts to flow. There is no drill pipe in the hole. Can the well be shut in under pressure?
A. Yes B. No
2. Using the BOP configuration shown below answer the following questions.
a. With no drill pipe in the hole, is it possible to shut the well in under pressure and repair the side outlets on the drilling spool?
A. Yes B. No
b. With no drill pipe in the hole, is it possible to shut the well in under pressure and repair the drilling spool?
A. Yes B. No
c. Is it possible to shut the well in with drill pipe in the hole and circulate through the drill pipe?
A. Yes B. No
d. While changing blind rams to pipe rams with drill pipe in the hole the well
starts to flow. Can the well be shut in?
A. Yes B. No
e. With no drill pipe in the hole, is it possible to shut the well in under pressure and change the pipe rams?
A. Yes B. No
f. With drill pipe in the hole, is it possible to shut the well in under pressure and change blind rams to pipe rams?
A. Yes B. No
3. Using t
您可能关注的文档
- (最新)2015湘教版小学美术一年级上册教案.doc
- -zbekoglu公司代理产品目录.docx
- 00242《民法学》2016年自学考试大纲.doc
- 02379计算机网络管理自考复习整理 第一章 网络管理概论.doc
- 03708中国近代史纲要电子教案(复习资料).doc
- 03708中国近现代史纲要的复习资料.doc
- 06093 人力资源开发与管理复习资料 广东.doc
- 0893本科《学前教育原理》试题答案及评分标准.doc
- 110kv变电站综合自动化设计初稿.doc
- 1955年小学语文教学大纲.docx
- General conditions of supply for machinery and equipment 翻译.docx
- glossary of mechanics.doc
- Hotel Management System(SRS).doc
- Maxon-QM-01(B0)品质手册-品质部.doc
- MP-06-002采购管制作业程序.doc
- MPS05模块化自动化生产线设计--III站.doc
- pep 新版 五年级下册 unit3 课件.doc
- PEP小学英语六年级上册教案全.doc
- Performance Evaluation of the WAP Protocol over SMS in a GSM Network外文翻译,最后附外文原文.docx
- Plant English.doc
文档评论(0)