- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
外文原文2:
Subcontracting and Competitive Bidding on
Incomplete Procurement Contracts
Daniel P. Miller
University of Minnesota
Job Market Paper
November 12, 2008
Abstract
This paper investigates the cost implications of contractual incompleteness and itse ect on subcontracting decisions in the bridge construction industry. Construction contracts are incomplete because the original blueprints and specications may require modications during construction. According to the transactions cost theory of the rm|Coase (1937), Williamson (1985)|such contract revisions can lead to signicant bargaining and renegotiation costs. Furthermore, theory predicts these costs are larger if a subcontractor performs the work. Forward looking contractors anticipate these costs and incorporate them in their bids. I develop an empirical framework to quantify the impact of incompleteness on cost for both integrated and non-integrated transactions and apply it to 32 bridge contracts procured by the California Depart-ment of Transportation. Contracts contain many work items (e.g. casting concrete,drilling, trac striping). For each item, contractors decide whether to perform work themselves or hire a subcontractor and submit a bid. The di erence between the work item quantity in the original contract and the quantity actually installed after revi-sions proxies for incompleteness. In estimation, I account for the strategic aspects of bidding to recover cost from bids and exploit the panel data structure to account for the endogeneity of subcontracting decisions. On average, incompleteness explains a small portion of cost, 2%, for integrated transactions and a large portion, 13%, for non-integrated transactions. The results provide quantitative evidence in support of in-complete contrac
您可能关注的文档
- 毕业设计 外文翻译 汽车的转向控制.doc
- 土木 建筑 毕业设计论文 外文翻译 中英文.doc
- 材料成型 毕业设计 英文翻译 中英文:关于机械设计知识及设计工具介绍.doc
- 采矿专业 毕业论文 毕业设计 外文翻译 中英文 关于神华集团露天矿拉斗铲的应用研究.doc
- 测控技术 毕业设计_外文翻译 中英文.doc
- 测控专业 毕业设计论文 外文翻译 中英文:聚合物传感器集成到无线数据采集系统中以适合监测环境和生理的发展过程.doc
- 城市规划 建筑 毕业设计论文 外文文献翻译 中英文:主题公园.doc
- 冲压模具 毕业设计 外文翻译 英文原文 中英文.doc
- 大学 毕业设计 城市地下铁道连拱隧道群施工技术研究 英文翻译.doc
- 单片机 芯片 毕业设计 外文文献翻译 中英文.doc
文档评论(0)