- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ifix工程新建步骤
新建ifix工程步骤:
在开始-----运行中输入BackupRestore.exe /FactoryDefault。
出现以下画面
2点击工程项目恢复向导
3选择factorydefault.ifd打开
4点击下一步
5.配置好路径点击完成。
6开始---所有程序----Proficy HMI SCADA - iFIX 5.1---系统配置
7.文件—新建
8.配置工程路径
点击更改项目确定—继续。
a special tool to measure half a point the rotor shaft runout and simultaneous measurement of two coupling flutter testing, it should meet the requirements. Install the coupling housings to ensure embedded rotor coupling within a concave shoulder, and rotor clearance meets the design requirements. 6.4, 6, wearing construction technology of generator rotors demonstration 6.4.6.1 construction preparation and conditions through the stator before loading check and confirm to confirm air tightness test of the stator and stator mechanical, electrical, instrumentation and control and other related work had been completed. Internal cleaning of stator, high power vacuum the surface of the stator. Stator and rotor magnetic Center drainage is complete. In conjunction with the quality, mechanical, electrical and other relevant persons to finally cleaning check the stator, which is clean and free of any debris. Worn rotors check and confirm confirm before loading the rotor air tightness test, electrical test work has been completed. In conjunction with the quality, mechanical, electrical and other relevant persons to finally clean the rotors checked, its interior is clean and free of any debris. By quality, mechanical, electrical and other professionals to conduct an examination of the rotor, confirm the wear condition of the rotor. Special equipment inspection and rotor through the preparation tool before loading inventory, check to confirm that it appears intact, complete tool, tools required for use of wire rope that has a factory certificate and test report; wire rope should select the safety factor ≥ 6; hoist testing qualified; road have been equipment authorized Visa temporary support ties should be a hardwood. Ends bearing end cover with connection of the stator plate or g
您可能关注的文档
最近下载
- 重庆文理学院,校考,中国现当代作家作品选复习题1.doc VIP
- BS EN 12350-6-2019 Testing fresh concrete Part 6:Density 新浇混凝土试验第6部分: 密度.pdf
- 交叉配血标本采集流程.pptx VIP
- BS EN 12350-2-2019 新鲜混凝土试验.第2部分:塌陷试验.pdf VIP
- 2025年大学校园二手市场调研报告.docx VIP
- 防雷检测防雷检测技术方案.pdf VIP
- 中医治疗胃肠病.pptx VIP
- SEW教学资料8MOVITRAC07B变频器参数设置.pptx VIP
- MOVITRAC07B调试手册1研讨.pptx VIP
- _阿贝折射仪测量结果的不确定度评定.pdf VIP
原创力文档


文档评论(0)