GP-9 节拍生产.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
RUN @ RATE GP-9 PURPOSE The purpose of a Run @ Rate is to verify: the suppliers actual manufacturing process is capable of producing components that meet GMs on-going quality requirements, as stated in the Production Part Approval Process (PPAP), at quoted tooling capacity for a specified period of time; and the suppliers actual manufacturing process conforms to the manufacturing and quality plan documented by the supplier in PPAP, GP-12 and other required documentation. During a Run @ Rate, all production tooling is to be in place and running at full capacity, utilizing all regular production, direct and indirect, personnel and support systems. SCOPE All new parts require a Run @ Rate, unless exempted by the supplier quality engineer and approved by the Supplier Quality and Purchasing Directors of the procuring division. SELECTION PROCESS All new part numbers will be evaluated by GM, taking into consideration factors such as the following: history; new technology; irreversible tooling changes; and new supplier facilities. The need for the Run @ Rate will be confirmed by the Supplier Quality Engineer, and approved by the Supplier Quality and Purchasing Director(s) of the procuring division. The supplier will be notified of the need to perform a customer monitored or supplier monitored Run @ Rate as early in the Advanced Product Quality Planning Process as possible. Note: See Section VIII for Additional Requirements for Supplier monitored Run @ Rate. GENERAL INFORMATION DURATION OF RUN @ RATE The number of components to be produced during the Run @ Rate should be sufficient to demonstrate manufacturing process capability and should be predetermined by the supplier and the procuring divisions Supplier Quality Engineer(s). Factors such as product complexity, shelf life, storage, cost and single shift vs. multiple shift operations are taken into consideration in determining the length of the Run @ Rate. The default length of the Run @ Rate is one day of t

文档评论(0)

精品报告 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档