- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
                        查看更多
                        
                    
                兖矿新陆建设发展有限公司施工组织设计方案说明书    施工方案书
                    大同煤矿集团圣厚源煤业有限公司
 
 回风斜井井筒掘进工程
 
施工组织设计
    
	
    
兖矿新陆建设发展有限公司同煤集团圣厚源项目部     
年  月  日
  
目    录
 
前言············································5
1   编制依据和原则······························6
1. 1  编制依据 ································6
1. 2   编制的指导思想和原则····················8
2   工程概况····································11
2. 1  矿井概况·································12
2. 2  现场施工条件·····························13
2. 3  施工要求·································15
2. 4  技术规范·································16
2. 5  招标范围、计划工期和质量要求·············16
2. 6  巷道技术特征·····························19
3    施工准备···································26
3. 1  技术准备施工队伍准备
3. 3  施工现场准备
3. 4  设备材料准备
3. 5  临时工业广场布置·························27
3. 6  供电·····································28
3. 7  通信·····································28
3. 8  供水及消防·······························28
3. 9  供热与洗浴·······························28
3. 10  排水及防洪······························28
3. 11  施工准备与工程排队······················30
4   施工方案和施工工艺··························30
4. 1  施工工艺综述·····························30
4. 2  施工方法·································30
4. 3  作业方式·································40
4. 4  施工关键技术
5   辅助生产系统系统压风
5. 4  供水·····································45
5. 5  排水·····································45
5. 6  通风降尘·································45
5. 7  通讯、信号及明···························50
5. 8  供电系统·································51
5. 9  测量·····································51
6   施工特殊措施································51
 6. 1  探放瓦斯··································51
 6. 2  揭煤······································52
 6. 3  防突安全措施······························54
7   施工组织与管理施工组织管理机构施工管理施工进度计划及保证措施工期安排工期保证措施
9    施工质量标准及质量保证措施
   9. 1  质量目标及承诺···························74
9. 2  采用的质量标准
9. 3  施工质量保证措施
9. 4  质量保证体系
9. 5  主要检测仪器
10  安全保证措施································86
10. 1  安全管理灾害预防措施及地下管线等保护加固措施施工措施管线及其它地上地下设施保护加固措施
12   文明施工及环境、职业健康保证措施文明施工管理措施
12. 2  文物保护措施
12. 3  职业健康保护措施
13  环境保护及水土保持的主要技术
                 原创力文档
原创力文档 
                        

文档评论(0)