隧道安全专项方案(改)重点.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
云南香格里拉至丽江高速公路 7-2工区 隧道工程施工安全专项方案 审批: 审核: 编制: 云南建工香丽高速公路土建施工第七项目部 二0一五年十二月 目 录 一、工程概况··················································01 (一)、工程简介·············································01 (二)、施工平面布置·········································03 (三)、隧道施工要求·········································04 (四)、隧道施工技术保证条件 ································04 二、编制依据··················································05 三、施工计划··················································05 (一)、进度计划·············································05 (二)、材料设备计划·········································06 四、隧道施工工艺··············································06 (一)、隧道开挖·············································06 (二)、爆破施工·············································12 (三)、常见的不良地质隧道施工·······························13 (四)、隧道衬砌台车、凿岩台架·······························15 (五)、通风设备及通风方案···································17 (六)、有害气体检测设备及监测·······························20 (七)、隧道超前监测·········································23 (八)、隧道变形监控·········································26 五、隧道施工安全保证措施·····································33 (一)、隧道施工危险源识别及控制·····························33 (二)、本合同段安全保证体系·································39 (三)、各危险性较大的分部分项工程专项方案···················41 (四)、施工安全应急预案·····································49 六、劳动力计划···············································57 (一)、专职安全生产人员·····································57 (二)、特种作业人员·········································57 七、相关图纸·················································57 阿黑洛隧道安全专项施工方案 为严格贯彻执行《云南省公路建设项目危险性较大的分部分项工程专项方案安全管理办法(试行)》及相关安全生产的有关规法律法规,坚持“安全第一,预防为主,综合治理”的安全方针,确保工程安全,制定本方案。 一、工程概况 (一)工程简介 香格里拉至丽江高速公路土建工程第七合同段位于云南省迪庆州香格里拉县虎跳峡镇境内。根据七合同段的实际情况,对标段的施工任务划分为五个工区,我部所属为11-2工区,施工里程:K58+263~K60+013,工程施工范围内包含阿黑洛隧道、排坝隧道,具体如下: 阿黑洛隧道 阿黑洛隧道为左、右分离式隧道,主洞采用r1 5.50m的单心圆衬砌断面,内轮廓净空宽度11.00m、净空高度7.10m,位于香格里拉县洼里顶村西侧,左右幅隧道测中线距离约39m~41m。 右幅隧道:起止点桩号为YK57+525~YK58+908.21,分界段全长1383.21m,隧道所在路段纵坡为-2.85%、-2.7%,最大埋深约为295m,7-2工区施工段里程为YK58+216.6~YK58+908.21,共计约6

文档评论(0)

baobei + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档